Loading...
Park West CC(18)-CS 990215.... -- HIGHLAP FIRE PROTECmlON CO. 2-15-99 Per our instructions from your Mr. Larry Davis, we have hydrostatically tested Park~vest I. Mr. Davis has indicated that we need to submit our results to your office for your approval. Following is a copy oQ.~he gauge readings from start t~ finish: PARK WEST I 2-13-99 THE ENTIRE SYSTEM HELD TEST PRESSURE 2 HOURS 45 MINUTES WITH~ VISIBLE LOSS AND THE GAUGES READ AS FOLLOWS: NORTH VAULT 210 PSI SOUTH VAULT 206 PSI SPIGOT 206 PSI WHEN SECTIONAL CONTROL VALVES WERE CLOSED .a2qD A FIRE HYDRANT OPENED TO BLEED PRESSURE FROM GAUGES, THE FOLLOWING R£SULTS WERE OBSERVED: ST.,-~RTING PRESSURE :' ENDv~GpffiR~URE NORTH VAULT 210 PSI ~ SOUTH VAULT 206 PSI 202 PSI -- °1' P~'~ ~e ~' ¢' SPIGOT 206 PSI 204 PSI '-' '2, F,~ ~ L e ¢ ~' Sincerely, /~ .... William Werner, Foreman PO BOX S,~&J? DAIJ.AS. TEXAS 75M~}847 {972)M0-8,134 (F, U0972-2'/8-T~ E.MAlL: rlt~re~am~l.~t MEMBERS: NFPA AgSA TFSCA 'rEY, AS REG,STRATION SCR0246 OKLAHOMA LICENSE - -' HIGHLAYD FIRE PROTECmION CO. DALLAS AUSTIN 2-15-99 Dear Mr. Cramp, Per our instructions from your Mr. Larry Davis, we have hydrostatically tested Parkwest II. Mr. Davis has indicated that we need to submit our results to your office for your approval. Following is a copy of all the gauge readings from start to finish: PARK WEST II 2-13-99 THE ENTIRE SYSTEM HELD TEST PRESSURE FOR 2 HOURS 45 MINUTES WlTH/~--O) VISIBLE LOSS ,au. ND THE GAUGES READ AS FOLLOWS: NORTH VAULT 209 PSI SOUTH VAULT 211 PSI SPIGOT 206 PSI WWrlEN SECTIONAL CONTROL VAJ_,VES WERE CLOSED AND A FIRE HYDR.,-~NT OPENED TO BLEED PRESSURE FROM GAUGES, THE FOLLOWING RESULTS WERE OBSERVED: STARTING PRESSURE / ENDING PRESSURE NORTH VAULT 209 PSI 205 PS! ---, SOUTH VAULT 2!!VSI 209 PSI - SPIGOT 206 PSI 203 PSI -- , W~alt~r Wright, Supj~lfident ' William Wemer, Foreman PO ~OX 550847 DN. LA$..T[XA$ 75355-~"7 (972) 84C-M34 (FAX} 972.278-7798 E-MAIL: MEM{L=R. S: NFPA A~.~.X TFSCA,~D(ASREGISTRATIONSCR~246 OKLAr,OMAUCENSE$§3