Loading...
Park West CC(18)-CS 900411 DONALD E. DAVIS CONSULTING ENGINEERS 5506 COCKRELL HILL ROAD DALLAS, TEXAS 75236 FAX: (214) 337-2338 .... STEVE GORAM CITY OF COPPELL - DIRECTOR OF PUBLIC WORKS DEPARTMENT OF PUBLIC WORK5 P.O. BOX 478 732 DEFOREST COPPELL, TEXAS 75019 RE: PARK WEST COMMERCE CENTER SITE 1 COIgO056.ASG AT THE CITY COUNCIL MEETING LAST NIGHT - THE PARK WEST COMMERCE CENTER FINAL PLAT WAS APPROVED. ONE OF THE CONDITIONS OF APPROVAL WAS THAT A WAIVER REQUIRING SIDEWALKS WAS GRANTED WITH CERTAIN STIPULATIONS. INCLUDED AS A COPY OF THE PLAT CONDITIONS THAT WERE MADE A PART OF THIS APPROVAL. NOTE THAT [ HAVE CIRCLED THE SIDEWALK CONDITION. STEVE - I AM SENDING THIS LETTER DIRECTLY TO YOU BECAUSE IT IS AN UNUSUAL REQUEST THAT I AM MAKING AND I AM NOT SURE OF THE PROPER CHANNELS. THIS LETTER IS TO REQUEST THAT THE SIDEWALK NOT BE BUILT AT OUR SITE I CONSTRUCTION. INCLUDED IS A COPY OF OUR REVISED DRAWING OF THE SITE DIMENSION PLAN WITH THE WALK REMOVED. WE NEED YOUR PROMPT ACTION SO THAT LARRY DAVIS CAN MAKE THE FINAL INSPECTION AND GIVE HIS APPROVAL. PLEASE CALL ME IF THERE IS ANYWAY I CAN HELP EXPEDITE THIS MATTER. I WILL COME RIGHT OVER FOR A CONFERENCE ANY TIME YOU SAY. DONALD E. DAVIS CONSULTING ENGINEERS CC.' LEE HANSEN MIKE TUCKER LARRY DAVIS ]~LAT CONDITION~ POR PARK W~.ST CO~M~.RC~. CF. NTER. F~NAL PLAT : 1. Final construction plans and profiles for sewer, water and storm sewers, shall Me submitted and approved by July 10, 1990. 2. Covenants and restrictions shall be executed by the owners b~ May 10~ 1990. 3. The development shall comply with the Floodplain Management Ordinance. Hydraulic studies muse be submitted and approved by July 10, 1990. The 12" sanitary sewer out-fall is almos~ at capacity and the installation of additional piping (capacitM) will be required. The developer ma2 be required to participate in the costs of such improvement in accordance with city ordinances. 5. A minimum of 20 £oo= utility easements are required except 10 foot easements may be provided a~ locations to Ms approved by staff. 6. A n~te shall be placed on the final plat stating that "all applicable development fees must be paid as each ~ develops " 7. P~SINO: a. Con~tr,,c~on ~lana: Construction plans for the infrastructure of the entire 328 acre development will be provided within ninety (90) days of approval of ~he final plat by ¢it~ Council. Providing drawings for ~he entire developmen~ assures the City that the infrastructure will be constructed in accordance wi~ a master pla~. Any significant deviations from the master plan will require complete review of the entire ~28 acre development. b. Construction off ln.*r,str,,ct~re: Utilities al~d roadways will be constructed when needed to support development of ~ny new lot. Construction permits must be obtained from the P~blic Works Department for such infrastructure improvements a~d a letter of final acceptance of infrastructure ~s rec/uired before a bulldia~ permit can be issued. However, if in the opinion of-the Director of Public Works it is warranted, the Director may recommend ~o the Building Inspec~ion Departmen~ tha~ a temporar~ building permi= be issued wi~h the understanding that the fine! letter of acceptance be procurred within a reasonable time. Prior to construction, the builder must obtain a building permit. Be£ore a structure is occupied, a certl£icate of occupancy must be obtained. Any requirements for infrastructure or bulldinq development in e£fect a~ the time of construction must be followed unless otherwise addressed in these conditions. During the replactinq phase, the in£rastructure needs will be assessed. Obtaining a building permit will trigger ~he construction of any additional in£ras~ructure necessary. Finally, the additional infraetruc~ure needed for the construction o~ buildings on any replanted lot will need to be £ully installed prior to the issuance of a certificate of occupancy for that lo~. c. Construction Permit Feeq: The City currently requires ~hat ~00~ o£ the of the filing fee for the ~inal plat be escrowed prior to approval of the final plat (the "inspectio~ fee"). Additionally, the Subdivision Ordinance requires 2he Developer to escrow an amount equal to 1.5~ off the cos2 of items to be constructed ~or dedication to the city (~he "Construction Permit Fee"). A variance to Section XVI, Paragraph E o£ the Subdivision Ordinance is hereby granted to allow the Developer to (i) pay inspection fees prior to the approval of £inal replats in amounts equal to 100~ of the ~iling £ee for each respective replat~ and (ii) pay the construction permi~ fees prior to obtaining construction permits £or improvements necessary for each replay i~ amounts equal 2o ~.5~ of ~he i~em~ to be constructed ~or dedication to the City ~e~essary for each respective replaY. d. ~o~thwes~ern Dr4ve~ Southwestern Drive shall be constructed as a four lane divided thoroughfare. Construction of Southwestern Drive shall be until such time that traffic on Southwestern Drive exceeds 8000 trips per day or as determined by ~he City Engineer. SI~EWAr.K~: Sidewalks shall be provided along Belt Line Road~ in accordance with the City Subdivision Ordinance. Sidewalks ~or 2he remainder of the development will be installed by the property owners' association when deemed necessary b~ a majority.of property owners, cr 2he City. The covenants and/ res~rict~one shall be amended accordingly to require the property owners' association to construct the sidewalks what/ so advised. -2-