Loading...
Park West CC(18)-CS 900305 (2) DONALD E. DAVIS PAGE 1 OF °-3 ~ CONSULTING ENGINEERS 5506 COCKRELL HILL ROAD DALLAS, TEXAS 75236 (214) 337-2332 MARCH RLISSELL C I TY ENC~EER 73:2~EF OREST ~PELL ~ TEXAS 7.J017 RE: F'ARK WEST COMMERCE CENTER SITE 1 CONSTRUCTION C058~081. ARD THE CALCULATIONS FOR THE LENGTH OF OPEN TRENCH THAT IS NECESSARY TO DISSIPATE A VELOCITY, CONSIDERS THAT THE WATER FLOWS OUT OF PIPES AT AN INITIAL HIGH VELOCITY (13.8 fps IN THIS CASE) AND LOSES ENERGY GRADUALLY DUE TO CHANNEL FRICTION. THIS FLOW IS SUPER-CRITICAL RESULTING IN A CORRESPONDING INCREASE IN DEPTH. THE FLOW CAN BE COMPUTED WITH REASONABLE ACCURACY BY USING THE CHEZY EQUATION: 2/3 1/2 V=Q/A = 1.47 R S n n = ROUGHNESS COEFFICIENT R = HYDRAULIC RADIUS S = SLOPE AS THE DEPTH OF FLOW INCREASES - IT WILL REACH A LEVEL AT WHICH THE GIVEN DISCHARGE "@" MAY FLOW IN THE GIVEN CHANNEL - DEFINED BY ITS SLOPE "$" AND ROUGHNESS "n" BY THE LAW OF MINIMUM ENERGY - NATURE WILL SELECT THE FLOW CONDITION AT WHICH THE RATE OF ENERGY LOSS IS LESS. A HYDRAULIC JUMP MUST OCCUR. EQUATING THE CHEZY FORMULA TO THE LOSS OF ENERGY IS DEFINED BY THE FOLLOWING EQUATIONS: 2/3 1/2 Q 1.486 R S V~vg= ---- = A ~IARL-:H 5, 1S~?~0 PAGE 2 OF 3 C0587081. ARD ANOTHER METHOD OF CACULATING THE LENGTH OF RIPRAP REQUIRED IS TAKEN FROM THE DONALD E. DAVIS CONSULTING ENGINEERING MANUAL. THIS METHOD USES AN EMPIRICAL TABLE BASED ON DATA AND RECOMMENDATIONS OF THE U.S. BUREAU OF RECLAMATION. THIS METHOD IS MORE CONSERVATIVE THAT THE MATHEMATICAL METHOD BASED ON THE CHEZ¥ FORMULA. THIS METHOD IS BASED ON THE FROUDE NUMBER. p---___ MARCH 5, 17~0 PAGE 3 OF 3 C058~C)81. ARD LENGTH REQUIRED = 10.7' - THE MINIMUM RECOMMENDED LENGTH IN THE DGNALD E. DAVIS CONSULTING ENGINEERING MANUAL IS 25 FEET. IN THIS CASE - 50 FEET IS SELECTED BECAUSE OF THE NEWLY CUT DITCH AND EASILY ERODABLE SOIL. DONALD E. DAVIS CONSULT I NG ENG I NEERS