Loading...
Park West CC(18)-CS 891005 TRENCH EXCAVATION DESIGN OCTOBER 5~ 1989 PARK WEST COMMERCE CENTER SITE 1 STORM DRAINS DONALD E. DAVIS CONSULTING ENGINEERS 5506 COCKRELL HILL ROAD DALLAS, TEXAS 75236 PAGE~ '~ THIS INVESTIGATION WAS CONDUCTED TO DETERMINE THE GEOTECHINiCAL ENGINEERSING CHARACTERISTICS OF THE SUBSURFACE PROFILE AT THE PURPOSED LOCATION FOR THE STORM DRAIN LINE AS SHOWN ON THE DRAWINGS. THE SUBSURFACE CONDITIONS WERE EVALUATED iN ORDER TO FORMULATE RECOMENDATIONS FOR EXCAVATIONS OF OPEN CUT TRENCHES FOR THE STORM DRAIN AT THIS SITE. THE TEST BORINGS ARE SHOWN IN THE GEOTECHNICAL INVESTIGATION BY MASON .JOHNSTON AND ASSOCIATES, iNC. FOR "PARK WEST COMMERCE CENTER - SITE 1", DATED 23 JUNE, 198~. THESE TEST BORINGS WERE USED IN THE EVALUATION FOR OPEN CUT TRENCHES THAT WILL BE USED IN THE STORM DRAIN. RECOMMENDATIONS: TRENCH METHODS - SEVERAL TRENCHING METHODS ARE AVAILABLE TO THE UTILITY CONTRACTOR INCLUDING OPEN CUT SLOPED EXCAVATION, SPACED SHEETING, TRENCH BOXES AND SHORINO. THE SCOPE OF THIS REPORT DOES NOT INCLUDE SPECIFICATIONS FOR SHORING OR TRENCH BOXES. PURPOSED SHORNING OR TRENCH BOX DESIGN MUST BE SUBMITTED AND APPROVED PRIOR TO USE ON THIS .JOB SITE. SLOPES FOR TRENCHING AND EXCAVATIONS - THERE ARE TWO SOILS TYPES FOUND IN THE SUBSURFACE PROFILE AT THIS SITE, AND EACH SOIL WILL BE CUT AT A DIFFERENT ALLOWABLE SLOPE. THE FOLLOWING TABLE OUTLINES THE DIFFERENT SOIL TYPES WITH THE ALLOWABLE CUT SLOPES FOR OPEN TRENCHES. TYPE DECRIPTION STEEPEST ALLOWABLE SLOPE HORIZONTAL : VERTICAL DEPTH 0-12 FT DEPTH 12-20 FT C CLAY~ STIFF DARK BROWN 1 : 1 2 : I A CLAY, STIFF LIGHT BROWN 3/4 : 1 1 : I PAGE PRECAUTIONS: IF THERE IS ANY INDICATION OF GENERAL OR LOCAL INSTABILITY, SLOPES SHOULD BE CUT BACK AT LEAST 1/4 HORIZONTAL TO 1 VERTICAL FLATTER THAN THE STABLE SLOPE. TRENCHES 0-12 FEET WILL OPEN LESS THAN 18 HOURS. iF OPEN LONGER THAN 18 HOURS, USE THE i2-20 FEET VALUES FOR CUT SLOPE. SOIL BENEATH THE WATER TABLE IS NOT INCLUDED IN THIS REPORT. IF THE WATER TABLE IS ENCOUNTERED USE BOX TYPE SUPPORT. TRENCHS WITH TWO OR MORE SOIL TYPES SHOULD BE CLASSIFIED IN ACCORDANCE WiTH THE WEAKEST LAYER. INSPECTION: DAILEY INSPECTION OF ALL EXCAVATIONS SHALL BE MADE BY A REGISTERED PROFESSIONAL ENGINEER, WITH PERIODIC INSPECTIONS BY A REPRESENTATIVE OF THE GEOTECHNICAL ENGINEER. ALL OSHA RECOMMENDATIONS ARE TO BE FOLLOWED BY THE CONTRACTOR . THESE RECOMMENDATIONS ARE BASED ON THE GEOTECHNICAL REPORT. HOWEVER. IT MUST BE RECOGNIZED THAT THE CONCLUSIONS REACHED IN THIS REPORT WERE BASED ON THE CONDITIONS AT THE TEST BORING LOCATIONS. THESE FINDINGS WERE OBTAINED, AND THESE RECOMMENDATIONS PREPARED IN ACCORDIANCE WITH GENERALY ACCEPTED ENGINEERING PRINCIPLES AND PRACTICES. SHOULD ANY UNUSUAL CONDITIONS BE ENCOUNTERED DURING CONSTRUCTION, THiS OFFICE IS TO BE NOTIFIED IMMEDIATELY SO THAT FURTHER iNVESTIGATIONS CAN BE MADE. CONS,..'LTING ENGINEER