Loading...
Parks Coppell ABQ-CS 880916 GINN, INC. CONSI LTING ENGINEERS September 16, 1988 Mr. Russell Doyle, P.E. S6[~2~ ~ City Engineer City of Coppell P.O. Box 478 Coppell, TX 75019 Re: MacArthur Blvd. Extension across Denton Creek Dear Russell: This letter is in response to your Rapid Letter, dated September 9, 1988, copy attached. Our recent conversations with Mr. Deaton, of Dannenbaum Engineering Corporation, indicate that they will now accept the higher discharges and design base flood elevations for Denton Creek at Denton Tap Road. Their intent is to completely replace the existing bridge over Denton Creek at Denton Tap Road and design it to the current requirements of the City of Coppell Floodplain Management Ordinance. Additionally, since there has been no Conditional Letter of Map Revision issued for the proposed bridge improvements prior to enactment of the Floodplain Management Ordinance, there will be no grandfathering of the proposed Denton Tap Bridge structure at Denton Creek. The ABQ property along Cottonwood Branch, west of and adjacent to Denton Tap Road, has been "grandfathered", with respect to the current Floodplain Management Ordinance. We have not received any plans of the drainge facilities for the MacArthur Boulevard extension as described in the attached and must assume that you are not seeking our comments pertaining thereto at this time. If we can be of further assistance, please call. Sincerg~ H. Wayne Ginn, P.E. JCK/HWG/dsp cc: Frank Trando'/ Shohre Daneshmand John C. Karlsruher Kevin Peiffer File 241-044 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 t ' DANNENBAUM ENGINEERING CORPORATION L ~ ~ ~ / 79~ ELMBRO~ DRIVE. SUITE 2~ DALLAS, TEXAS 75247 (214) ~8-0145 ~ay 2, 1988 ~ ........... Ms. Shohre Daneshmand City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: MacArthur Blvd. Extension Across Denton Creek Dear Ms. Daneshmand: As you requested in our recent meeting I am providing you with a drainage area map for the proposed drainage facilities along the MacArthur Blvd. extension across Denton Creek north of DeForest Lane. I have also inclosed preliminary profiles of the proposed drainage structures. At our meeting we also discussed the hydraulic studies prepared for the City of Coppell by Anderson Engineers, Inc. Attached herewith for your review is a copy of a letter I sent to Mr. Wayne Ginn concerning a problem I have with the discharges used in the study. If you have questions concerning this letter, please call. Sincerely, DANNENBAUM ENGINEERING CORPORATION Phil Deaton, P.E. Project Manager PD:cr:O850PD 2201-01 DANNENBAU/VI, ENGINEERING CORPORATION November '1, ]987 Mr. Wayne Ginn Ginn. Inc. Consulting Engineers 17103 Preston Road. Suite 100 Dallas, Texas 75248 Re: Denton lap Road at Denton Creek Dear Wayne: As you are aware, we are cu~v preparing construction plans for the widening of the existing Denton a; Road bridge across Denton Creex. As a result of the recently adopted Soppell Flood Plain Ordinance, we have Peen reevaluating the hydraulic adequacy of the existing bridge. Our initial evaluation was based on information contained in the 1986 report titled Denton Creek Floodplain Study. prepared for the City of Coppell by Anderson Engineers. Inc. In this report it was recommended that design discharges be computed using the HEC-1 computer model assuming a fully developed watershed. The water surface profiles presented in the report were based on discharges computed using the HEC-1 model. The lO0-year water surface level immediacely upstream of Denton Tap Road, for a discharge of 19,730 cfs, was shown to De elevation 458.58 (see Figure 2-5, 1986 report), which is approximately feet below the existing low steel of the bridge. During our reevaluation I called Mr. Carl Anderson to be sure that the information contained in the 1986 report had not been revised. I was informed by Mr. Anderson that he had restudied the discharges on Denton Creek. He had determined that an analysis based on USGS gage records for the gaging station at SH121 should be used to compute the lO0-year discharges along Denton Creek. With this type of analysis, the lO0-year discharge increased from ~he i9.730 cfs value previously dete~qned, to 27,430 cfs. The l$O-yeaF water surface level (design base ilooo', upstream of the brioge increasec to elevation ~62.96. With the elevat:c~,, tme bridge would not have the required freeboard and would nave to be re: aced to meet the requirements o~ tr~e city ordinance. 1 have reviewed the methods used by Mr. Anderson to develop the higher discharges. The method utilized h~$teric USGS gaged stream flows at SH !21 to predict discharges for specific ~--ecuencies. lhe h~storic flows in Denton Creek have been regulated by a ~:?;,s of Engineers flood control reservoir. Late Grapevine. since ]952. a~ ~;aged flows at SH ]2] subseq~ent to 1952 Wayne Ginn ar ]], 1987 Page two reflect the attenuating effect that the lake has on flows in the creek. Gaged flows prior to ]952 do not reflect the effect that the lake has on creek flows. In order to determine what flows would have occurred prior to 1952, if the lake had existed at that time a routing through the lake would be required. This routing would undoubtedly show that the pre-1952 discharges at the gage would have been significantly less if the lake had been in place. It so happens that for the gage period 1948 through 1984 which was used by Mr. Anderson in his analysis, the highest, third highest, and fourth highest historical flows occurred prior to 1952. In his analysis, these flows were not modified to reflect the effect that Lake Grapevine would have on them. Use of the unmodified flows has resulted in an artificially high prediction of lO0-year discharges. I believe that if the historic pre-J952 flows were modified to account for the effect of the lake, as they should be, the ]O0-year discharge would be significantly lower. This lower discharge would result in a lower lO0-year water surface profile in Denton Creek. The existing Denton Tap Road bridge would then have the required freeboard over this lowered profile. We hereby request that the lO0-year discharges be recomputed using gage records modified to reflect the effect of Lake Grapevine, or that discharges based on the HEC-1 model be adopted. We also request that new water surface profiles be computed using the revised discharges. We request your earliest assistance in resolving this matter. We cannot continue with the design of the Denton Tap Road bridge until we are confident of the discharge and water surface levels which the City will use in reviewing our design. Any revised information should also be provided to FEMA. Please call me if you have any questions or wish to discuss this matter further. Sincerely. DAN,~;£NBAUM ENGINEERING CORPORATION Phil L~eaton, P.[. Pr'o~ ect Manager PD:cr:04055 2201-01 cc: Mr. Tom Tanner