Loading...
Parks Coppell ABQ-CS 881012October 12, 1988 TO: Russell Doyle, City Engineer FROM: Steve Goram, Director of Public W RE: Drain Structure #5 - Parks of Coppell Public Works - Parks has reviewed the proposal submitted 10/3/88 by Tom Wise of Wiseco with the following comments: Will the proposed modification affect the ability of the proposed impoundment in its pool or storage elevation of 447' per the grading plan of 9-86? Will the increased volume of water to pass through this pipe to the creek have any impact on the embedment or cause erosion to the levee at the gate? Will any impact occur to the drainage channel during this period should heavy volume of water be received (i.e. backwater effect)? The grading plan for the areas west of this structure indicate a pipe buried to relieve any flooding through the gas pipe easement to this inlet. Will this affect the draining efforts? Overall there are no objections to the modifications. The only issues remaining are the designation of responsibility for issuing a permit and assuring compliance with the understood plans through an inspection. These are questions which should also be addressed now. You may be aware, per the direction of the Public Works Director, notification to the City Manager concerning the agreement is being prepared. SGG/sm cc: Richard Diano, Park Foreman I SUBJECT ~ DATE MESSAGECv~' ;¢b;,:,---r 6'~ ,~p~~ ~ ~ '~PS~F[:~ :~: .............. RECIPIENT: REPLY ON PINK COPY -- RETAIN WHITE COPY DATE DATE REPLY ..................................................................................... SIGNED SENDER ... RETAIN THIS COPY