Loading...
Parks Coppell ABQ-CS 881209 HANDWRITTEN MEMORANDUM TO: ~'~' ~J~J ~ DATE: SUBJECT: ~:~,'~ ~LC~ ~'ST o~ Oe,~ ~ ~ aY~7 I~' ~ ~ ~ ] [~' 5~o~ ~ ~ ~ ~--~,*".,'1 GINN, INC. CONSULTING ENGINEERS December 7, 1988 Mr. Russell Doyle P.E. City Engineer , , City of Coppell P.O. Box 478 Coppell, TX 75019 Re: Parkway Blvd. West of Denton Tap Road Dear Mr. Doyle: This letter is in response to the note on the attached letter from Jerry Parche Consulting Engineers. A quick review of the plans enclosed with that letter indicates that road is being constructed to Sta. 53+63.73 just east of the property line for the Andrew Brown Community Park. It appears that Parkway Blvd., when extended to the west, will cross on to the park property at Sta. 52+98.49. It is our understanding that the Right-of-Way depicted on the drawings you are referring to will be dedicated on a forthcoming final plat. Prior to City Council and P & Z consideration of Final Plat and Engineering Plans, the DRC will review the proposed project. Mr. Peiffer can give the necessary technical review at that time if you so wish. Please call Mr. Peiffer if you have any further questions. Sincerelv,./~ H. Wa~Ginn, P.E. JCK/HWG/dsp attachments cc: Kevin Peiffer, P.E. John Karlsruher, P.E. File 88305 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 4P Jerry Parch8 Consulting Engineers November 25, 1988 . "' ? Mr. John Karlsruher, P.E. Ginn, Inc. 17103 Preston Road Suite 100, LB 118 Dallas, Texas 75248 ~43T' D~O~T'~ ~ RE: JP No. 88009; Parkway Boulevard; West of Denton Tap Road; Coppell, Texas ~-~ Dear John: Enclosed is a print of our construction drawing of Parkway Bouelvard extending west of Denton Tap Road for your use. As I have advised you previously, the station of Denton Tap Road at the intersection with the centerline of Parkway Boulevard shown on the attached drawing (Denton Tap Road Station 191+12.08) was determined using our survey ties for the back and ahead tangents of the curve in Denton Tap Road, and the radius and delta angle shown on improvement plans for Denton Tap Road perpared by Ginn, Inc. This information enabled us to establish the centerline of Denton Tap Road. We then projected the centerline of Parkway Boulevard (As Built on the east side of Denton Tap Road) to the west and determined the intersection of the roadway Centerlines. Our procedure to establish the centerline of Denton Tap Road as described above required us to adjust the location of two existing nails, which seemed to be the PC and PT of the curve in the centerline of Denton Tap Road at Parkway Boulevard, approximately 0.2 ft. to the north. In order that the turnout you are designing for the extension of Parkway Boulevard west of Denton Tap Road is located in accordance with our plat and construction plans, I have also included a prelimi~a.ry cop~ o~___Y~he Final Plat of "Parkway Boulevard West" This plat gives dimensions to north and south property corners of ABQ Development Corporation frontage on Denton Tap Road. The dimensions are in accordance with dimensions shown on the worksheet I provided you on October 29, 1988 and with the approved Preliminary Plat of "Parkway Boulevard West". Since our firms are preparing plans for Parkway Boulevard West concurrently, it is important that we are in accordance on the roadway location. Please use the ties to ABQ property corners shown on the Final Plat enclosed for the location of Parkway Boulevard West, rather than computed centerline stationing in Denton Tap Road. 320 V,/estway Place, Suite 501 · Arlington, Texas 760~8 · Metro (817} 467-2418 · (817) 465-0259 Mr. John Karlsruher, P.E. November 25, 1988 JP No. 88009 PaGe 2 of 2 Also please be advised that there appears to be a difference in elevation datum between your plans for Denton Tap Road and elevations used on our construction plans. We have lowered elevations on the Denton Tap Road improvement plans by 0.36 feet to be in accordance with the elevation datum we are usinG. Unless I hear differently from you, I will assume that the location of the Parkway Boulevard West turnout shown on your plans with regard to corners of ABQ Development property on the west side of Denton Tap Road is in accordance with the dimensions shown on the Final Plat of Parkway Boulevard West enclosed. If we can assist you in locating ABQ property corners on Denton Tap Road, please call. Thank you. Sincerely,~ JP:ch Enclosures: Parkway Boulevard Plan and Profile (Preliminary Copy) Parkway Boulevard West Final Plat (Preliminary Copy) cc: Mr. Russell Doyle, P.E./City of Coppell with enclosures Mr. Jay Chester, P.E./ABQ Development Corporation /85.~" ~- S~Z.se/ . , ~,.5o' c · 7.~//.. nor o~'~5"w ~ IO.~' A: gg' 15' BOULEVARD · "'" ~- ~="~'~' ~ IT: ~11.~' ~01°0~'35 W '. i L- 151.00' I0.~' · . ~, 1~'~'05 T. T~.~?, · .. ~ ~ ~.~' L, II~.$1' J ~'5~'$&'W "-., T. ~.$1 ~l. ~, COF~ELL IS.g. ~. R. ~.~, (U~L~TT~g) ~ ~ ~ ~ · I~.o~' T.~L ~F ~ ~OL ~lO~,P~ ~7 ~ I A~Q PEVELOF~E~T ~ISTt~O [~ ~ ~O'UTIL ES~IT ~ P C T ~OL 7oo74, ~ 75 ~[ICE departing from said west propurty 11nu i33.31 tect a]ond Notary Public, StAte of Tex~-s said Curve to the k~ght having a radius of 390.00 ~t, a central angle of 19° 35' 03" and a chord bea~inq N 41~ 05' 0~" E, 132.66 feet to al~ i~on rod at th= End of said Curve; SURVEYOR ~ER_TIFICATE I, JACK M. C£AWFORD, a Registered Public Surveyor of the State of Tcxas, certifies that the above street Right-of-Way was platted from an actual survey on the ground, and that all corners, an~le points, and points of curve shall be properly ~,a~ked on the Ground, and that this plat correctly represents that survey made Date ~y me or under my direction and supervision. ~'"~ ................. :"'~ JACK M. CRAWFORD, LAN[) %iIRVEYtN(i q ~ JACK M. CRAWFORD ~ TOPO(~aPH[C P O Box ~ 13-'4 ' 3908 South F't'*~wd~ y of the ~iW o~ Co~,~, FINAL oing final plat of Parkway the City o[ Coppell, was OF on the day cil, by formal action, then , streets, ea,ements, and BOULEVARD set forth in .nd upon ~aid PARKWAY zed the ~a~or to note the ~s herelnabove subscribed. (WEST) ~e~.~ aE~UG 2.a~ AC~ES OF ~D L~ATED ~ THE C~ OF COCPELL, O~ ~ THE S. A. AND M. G. ~. ~. SU~Y, ABSTRACT ~O. ~4a0 AMD mE GEORGE W. BACK SURVEY, ABS~GT NO. ~4, .... ~ DALES COUNt, TE~S 5LO~E~ ORPORATION NOVEMBER 19~ '5 87125 ..... ) ] ~ JerryParch~ConsultingEngineers --: O '~%, =~ PARKS OF COPPELL ~~' ..... ~' PARKWAY BOUL[VA~D , ~ ~ ..... .- ~. ~-- -~-~~ ..... '-- 1~ ...... ~ - · ~--- ABQ DEVELOPMENT CORPORATION- DEVELOPER .... _ ....... _ _ ' ~. CITY OF COPPELL, TEXAS . " ~ --~ Je ry Parch~ Con~ulting Englneer~ ,~ ~ t~ '~ ~ .-- DESIGNFD RY: ___jp_ R~tFF T NO ~- ----- DRAWN RY: AG . .NOVEMBER 1988 8" C0[10RE 1 [ PAVLlrrlt 0fl ~" .~,TA[51LIZED ABQ DEVELOPMEN-I CORPOt;ATION ABQ DEVELOPMENT CORPORATION BENCHMARKS I . Scluar~-' cut on top PA~KWA~ ~LVD ~ ~ ~O0'RT P,~kw,,y Hlw{. ~ 5TA h% . 81 90 - ~ 00 RI '/ ' E~D LI TURrl LAR[] rR&flSiTlon F7 ~ 5fA 58 * 2~ 4~ ~E PAVE~E~ COnStRUCT lq' KECES%ED CURB INLET %/6: qGE.~O'