Loading...
Parks Coppell ABQ-CS 891027 Jerry Parch Consulting Engineers October 27, 1989 City Engineer City of Coppell P O Box 478 Coppell, Texas 75019 214/471-2251 H. ~.A_N. D Q_ED ~_VE R ED_ RE: JP No. 88009; Heartz Road; Parks of Coppell; Coppell, Texas Dear Russell: We are currently preparing a bid package for the construction of Heartz Road from Sandy Lake Road to Parkway Boulevard in accordance with construction plans approved by the City of Coppell in June, 1989. The work should begin shortly after filing of instruments evidencing dedication of Right-of-Way and a construction easement by the Perkins' heirs. I would appreciate if the city would inform me when these documents are filed-and provide me copies of the recorded instruments. The work will commence with a Contract for. preparation of the subGrade in accordance with plans approved by your office on May 9, 1989. Ten sets of these plans are enclosed. Please stamp and sign the cover sheet, retain copies required by the City, and contact us so that we may pick up the rest folr our use. Concurrent with preparation of the Heartz Road subGrade, other grading work will be underway in accordance with a separate contract between ABQ Development Corporation and the contractor working on Heartz Road. This other work will be on private property own~ ~y either lB0 D~v~loDm~nt Corporation or P~rk~ of Coppell Joint Venture. ks requested by Mr. Dale Jackson in a telephone conversation with him on October 25, 1989, I will provide plans of this proposed Grading on private property to the City. 320 V,/estway Place, Suite 501 · Arlington, Texas 76018 · Metro (817) 467-2418 · (817) 465-0259 October 27, 1989 Mr. Russell Doyle, P.E. Page 2 of 2 Jp No. 88009 On behalf of ABQ, I appreciate your prompt response to our request. I will contact Mr. Larry Davis of your office to set up a preconstruction meeting once a contract is awarded. Our current target date to begin construction is November 15, 1989. Thank you. Sincerely~_ 'erry p~P/E jP:ch Enclosures: 10 Sets-Plans for Subgrade Preparation-Heartz Road cc: Mr. Jay Chester, p.E./ABQ Development Corporation Mr. Mike Allen/Parks of Coppell Joint Venture II Mr. Harry Hargrave/Parks of Coppell Joint Venture II Mr. Larry Davis/City of Coppell Mr. Larry jackson/Attorney Mr. Dale Jackson/City of CoDpell