Loading...
Lakes of C 1stP-CS 860227 J~ ~'-~J~ /J NATHAN D. MAIER-- I ,_.21Vl CONSULTING ENGINEERS, I. 84-03-003.D SHEET 1 OF 3 30B NO: Del~t Road PROJECT DESCRIPTION: DATE' 2-27~86 PREPARED BY' BH ITEM QUANTITY UNIT DESCRIPTION UNIT TOTAL NO. PRICE DRRI~RG~ i 4 ER ?±~e-to-Pipe Con~eotion 276. O0 1,104 O0 2 1 EA Extend Headwal 1 @ MacArthur 750.00 750 00 3 1 EA 36" Type "B" Headwall 750.00 750 00 4 1 EA 36" Type "B" Multiple Headwaii i500.00 'i,5OO 0O 5 2 EA 8' Standard Curb Inlet 1600.00 3,200 00 6 2 EA 10' Standard Curb Inlet 2075.00 4,150 00 7 2 EA 14' Standard Curb Inlet 2577.00 5,152 00 8 40 LF 18" Class III Reinf. Conc. Pipe 28.70 1,148 00 9 56 LF 21" Class III Reinf. Conc. Pipe 33.05 1,850 80 10 686 LF 24" Class III Reinf. Conc. Pipe 37.85 25,965 10 11 70 LF 27" Class III Reinf. Conc. Pipe 42.00 2,940 00 12 893 LF 36" Class III Reinf. Conc. Pipe 58.00 51,794 00 13 891 LF 33" Class III Reinf. Conc. Pipe 50.00 44,550 00 ' ~O~J~L ~r~. DP~LAGE 144,8531 90 1 2730 CY Unclassified Street Excavation 3.50 9,555 00 2 5580 CY Earth Borrow 7.10 39,618 00 TOTAL ~ 49,173 00 ] X~M NATHAN D. MAIER '" CONSULTING ENGINEERS, Ih,.. JOB NO: 84-03-003.D SHEET 2,,_ OF 3 PROJECT DESCRIPTION. De~st Road DATE-. 2-27-86 PREPARED BY: BH ITEM QUANTITY UNIT DESCRIPTION UNIT TOTAL NO. PRICE I 28 TN Asphalt for Pavement Trans. ~8.00 1,624 00 2 11,410 SY Lime Stabilized Base Course 1.15 13,121 50 3 10,660 SY 6" 3000 PSI Reinforced Conc. Pvmnt:. 21.45 228,657 00 4 7,030 LF 6" 3000 PSI Conc. Integral Curb 2.35 16,520 50 TO~ALPA~ 259,923 00 1 1,005 LF 8" D.I. Pipe 20.67 20,773 35 2 1,145 LF 10" D.I. Pipe 27.50 31,487 50 3 5 EA Fire Hydrant 1317.00 6,585 00 4 1 LS Relocate Fire Hydrant 1500.00 1,500 00 5 5 EA 6" Gate Valve 315.00 1,575 00 6 1 EA 8" Gate Valve 480.00 480 00 7 3 EA 10" Gate Valve 520.00 1,560 00 8 1 LS Hydrostatic Water System Test 1,762 50 TOT~L~ 65,723 35 MI~AN~OU$ 1 76.5 CY Retaining Wall 400.00 30,600 00 TO~ALMISCRTXAN~O~S 30,600 00 ] ~-~M NATHAN D. MAIER'""' 84-03-003.D SHEET. 3 OF 3 JOB NO: PROJECT DESCRIPTION. DATE' 2-27-86 PREPARED BY- BH ITEM QUANTITY UNIT DESCRIPTION UNIT TOTAL NO. PRICE Drainage 144,853 90 Earthwork 49,173 00 Paving 259,923 00 Water 65,723 35 Miscellaneous 30,600 00 SUBTOTAL 550,273 25 10% Contingency 55,027 33 TOTAL 605,300 58