Loading...
PA9601-LR 970505 'l ~ blLTECH ENGINEERING AND TESTING INC. 31LTECH ENGINEERING AND TESTING INC. 7415 White Hell Suite ~t109 I~rt Worth. TOXOG 7E~118 FOX 817-5950708 817-59~064 SOIL MOISTURE - DENSITY TEST REPORT IN - PLACE TESTS BY NUCLEAR METHODS CLIENT: P~vmnt Colnip ' 1 and Mmnt. PROJECT: Coppemto~e J~ F Trail Percent Compactton: Moi;ture Content L CURVE NO. 1 2 REPORT DATE: 04-28-97 REPORT NO.: 97-058 100 TEST [ !IKI!9~ALREI~ENGECURVE DATA METHOD MATERIAL DESCRIPTION 6eSA Brow ~ Clay with gravel TEST LIFT OR NO, ELEVATION : E ;IN4N, AOE TI~T RESULTS i D~lllst~i~;~llE TESTS ~ I~R ~ D~. 03017. RESPECTI~LY LO~TION REF. DRY DENSITY CUR~ JO4)QING TRAIL 1 NIt. Subgrl(le S~. 1 +82 2 Net. SUbgrade Sa 'k 4+55 3 Nat. Sulkride St 8 25 TEST DATA MAX. DRY OPTIMUM DENSITY (pcf) MOISTURE (%) 123,8 10.7 110.5 15.4 MOISTURE % OF MAX. (%) DRY DENSITY I 119.8 11.8 97 2 115.8 13.2 105 2 108.5 20.2 98 NUCLEAR GAUGEI,D.: 6.,,~ AN "R"AFTER THE TEST~ 'INDICATE8 FAILURE TO 8TD, DENSITY COUNT: 2859 IIER INOtCATE RE'rEST, :PLY IrrH PROJECT SPECIFICATIONS. STD, MOISTURE COUNT: 485 CLIENT: Pavement Conltp' PROJECT; CoppefltoneTr. Percent ComlNIctio~: Moisture COntent (%): CURVE TEST NO, METHOD B6~8 BtOwr 2 A8~8 ardor 51LTECH AND TESTING INC. n & Maim. 7415 Whil;,e Hall, ~;uit;e FOr't; WOrt;h, Taxae 76118 F:ax 817-~9~-0708 81 SOIL MOISTURE - DENSITY TEST REPORT IN - PLACE TESTS BY NUCLEAR METHODS REPORT DATE: AI3ril 30, 1997 REPORT NO.: 97-058.104 TEST DATA :MATERIAL REFERENCE CURVE DATA MATERIAL DESCRIPTION Brown Settoy Clly MAX. DRY OPTIMUM DENSITY (pc'f) MOISTURE (%) 123.8 10.7 110,5 15.4 13l~N6~ ~ TEST RESULTS ! ' TY~iMOI~URE TESTS A.EPL~ A~ D~22. D~17, RESPECTIVELY TEST LIFT OR REF. DRY DENSITY MOISTURE % OF MAX, NO. ELEVATION LOCATION CURVE (Pd) (%) DRY OENSITY I Grade T 1+75 1 110.5 117 89' 2 Grade T~ 4+95 2 95 0 20.4 86' 3 GrlKle ~ ,B+15 2 95.4 18,6 86* NUCLEAR GAUGE I.O.: AN "R' AFTER THE TEST N~ · INDICATES FAILURE TO k Remarks: STD DENSITY COUNT: 3875 :ER INDICATE RETEST. ,.. 'LYe NIOJECT SPECIFICATIONS. STD. MOISTURE COUNT: 514 SOl ~NGINEER il AND TESTING, INC. endue ' [ ng Mane, 'L ILTECH ENGINEERING AND TESTING INC. SOIL IIOIITURE - DENSITY TEST REPORT IN - PLACE TEATS BY NUCLEAR METHODS CLIENT: Pavement Conml~ PROJECT: Copperstone Tr' Percent Complclion: F ' Moisture Content (%): :~ & MiN~. REPORT DATE: April 30. 1997 REPOR_T NO.: 97-058.104 TEST DATA Tested: 104-17-97 Technician: Don James CURVE NO, 1 2 3 TEST NO. 1 2 3 .:!: ,T ' :!ILt~LltlEFERENGE CURVE DATA TEST MAX. DRY OPTIMUM METHOD MATERIAL DESCRIPTION DENSITY (pcf) MOISTURE (%) Beg8 Srow~ 't¢lyCleyw/gmvel 123,8 10,7 A6g8 Br~w 'kBrovwl~ene/Cley 110.5 15.4 Begs Fle3d~ r ~35.6 7.4 ' ,IN~ TEal RESULTS ; :{)~tY;~ TrdiT8 AI~ ~ A~m l)Z922. D3OI 7. RESPECTIVELY LIFT OR REF. DRY DENSITY MOISTURE % OF MAX. ELEVATION LOCATION CURVE (pcf) (%) DRY DENSITY Subgle T_ 0+35 3 133.5 7, 1 99 Subgrade T, 3+25 3 136.1 6.4 101 Subgrade T; ~+Be 3 128.1 4, 1 * 95 NUCLEAR GAUGE LD,: AN "R" AFTER THE TEST ' INDICATES FAILURE TO Remarka: STD. DENSITY COUNT: 2553 .~R INDr, ATE RETEST. · LY Wtq'H PROJECT SPECIFICATIONS. STD MOISTURE COUNT: 485  ;~r~ND STING, INC. SOILT CH ENGINEER Mane ,MT CLIENT: Pavement Conlt~, PROJECT; ~ T, .. Percent ComlNIclion; Moisture CoNlint (%): ,. CURVE TEST NO. METHOD 1 B69e 2 AN8 3 BeN TEST LIFT OR NO. ELEVATION 1R Final Grade '1 . blL/ECH ENGINEERING AND TESTING INC. For~ Wcx~h. Texas 76118 Bq 7-~9~ 8OIL MOISTURE - DENSITY TEST REPORT IN - PLACE TESTS BY NUCLEAR METHODS 1 & Mlint. REPORT DATE: April 30, 1991 REPORT NO.: 97-058.104 Date Tested: 104-18-97 Technician: Don James TEST DATA MATERIAL DESCRIPTION sr~w idyc~w/m.v~ BroWf JBrownSlne/Cley r i~PLACE TEST Rf. JULI'S :~r~tryijiMI~~TS AI~pI~R A.~D2~22, D3017. RESPeCTI~LY REF. DRY DENSI~ LOCATION CURVE (p~ R~. ) ~11-97 ~. 97).1~ Tall 6+85 3 129.0 MAX. DRY OPTIMUM DENSITY (pcf) MOISTURE (%). 123.8 10.7 110.5 15.4 135.6 74 MOISTURE % OF MAY,. (%) ORY DENSITY 9 4 95 NUCLEAR GAUGE I,D,: ,,~ t ' STD, DENSITY COUNT: 2528 AN "R' AFTER THE TEST Nm .'R INDICATE RETEST. * INDICATES FAILURE TO C , -Ly WITH PROJECT SPECIFICATIONS, Rema~s: STD MOISTURE COUNT: 484 S~~a. ~ ~ O~ _=~ ~ A~D TESTING, INC. · Perdud F OILTECH ENGINEERING AND TESTING INC. F;ex 1~117-595-070EI 81 CLIENT: Pavement Construe PROJECT: COppereto~e Jog TO: Strength .Slump (in.): Air COnte.nt Concrete Tamp ('F): ;ONCRETE INSPECTION AND COMPRESSION TEST REPORT REPORT DATE: 04/30/cJ7 REPORT NO.: 97-058.107 REPORT DISTRIBUTION: ~: PROJECT DATA Date of Pll~ernent: 04-23-g7 Sempie<l By: J AnneliD Welther: Clear Supplier/Mix: Lettimom :' FIILDDATAIIT#f Ticket #: 7033442. TIr~ JB~tched; 11 ;38 A M Time Sampled: ,Slump (in.): 5" ,, Nr Content (%): % Unit Weight (pcf): ConCrete Tamp (*F): Air Tamp ('F): Yardage (cu .yd.) Location/RemarkS; 454 Coppemb.. %,old-Cl]epeslelel Trail 12:15 P M 18cy FIF,4,O OA'rA SET Ticket 1: ~ TIme ~Jled: Time Sampled: Slump (in).: Air Content (%): Unit Weight Concrete Tamp (*F): Air Tamp ('F); Yardage (cu.yd): Location/Reminds: ~ C~N TEST RESULTS CYLINOERS:~At41~. , 8 IOILTECH ENQINEERINQ AND TESTiNG, INC ARE PER ASTM C31, TESTED PER ASTM C39 SET CYLINDER DATE AGE MAX. LOAD STRENGTH NOTF. S NO, NO. ESTED (dlyl) (Ibl) (psi) N-30 7 106,000 3.750 ,~4-30 7 106,500 3.760 ~5-21 28 : 28.;i7 m=l. in. ' ATE UE~'INNUIE ' ' I