Loading...
Northlake 635(7)-CS000823 972 384 3547 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: Lanny Allison, Construction Inspector Engineering From: Danny Hightower, Utilities Division Public Works Date: August 23, 2000 RE: Walk-thru PSINet 1. Need 2 domestic meters 2. Oue (1) DC Z" needs cut off haadles. 3. Seal inside vault on north side of building. 4. Clean out CO sewer on north side of building 20' from vault. $. Need F.H. markers in street by all F.H. blue markers. 6. Manhole N.E. of building need rain pan out of bottom of manhole & clean bottom of manhole. 7. F.H. valve at Lakeshore & Crestside dig up stack and reset with new pad cannot get on valve, 8. Raise sewer manhole on Lakeshore middle of building to ground high & need r_himney seal. 9. Vault on east side of building needs new link seal on street side of pipe inside vault. 10. Drainage cleanout needs caps & pad on southeast cornet' of building. 11, Repair F.H. at back of building-will not cut off. 12. Valve stack on F.H. southwest of building cannot get on valve-repair with new pad. 13. **Cut & plug grease trap tied in to drainage.** CI'TY OF COPP£L,L PUBLIC WORKS DEPARTMF..Arl'