Northlake 635(7)-CS000821 MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To: .,Mike Martin, P.E., Asst. City Engineer
Glenn D. Hollowell, P.E., Asst. Public Works Director
From: Lanny Allison, Construction Inspector
Date: August 21, 2000
RE: Walk-Thru for PSINet
A walk-thru for streets, utilities and drainage on the referenced project has been
scheduled for Tuesday, August 22, 2000 at 9:00 a.m.
If I can be of further assistance please let me know.
cc: James Cofer, TriDal Ltd. FAX 817/481-8195
file/subd/psi.wt