Loading...
Northlake 635(7)-CS000821 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: .,Mike Martin, P.E., Asst. City Engineer Glenn D. Hollowell, P.E., Asst. Public Works Director From: Lanny Allison, Construction Inspector Date: August 21, 2000 RE: Walk-Thru for PSINet A walk-thru for streets, utilities and drainage on the referenced project has been scheduled for Tuesday, August 22, 2000 at 9:00 a.m. If I can be of further assistance please let me know. cc: James Cofer, TriDal Ltd. FAX 817/481-8195 file/subd/psi.wt