Loading...
Northlake 635(7)-CS000405 Coppell. Texas 75019 ~j~ /}~ The City With A Beautiful Future~COPPELL.PO BOX 478TEXAS 75019 972-462-0022 April 5, 2000 Jack Evans Pacheco Koch Consulting Engineers 9401 LBJ Freeway Suite 300 Dallas, Texas 75243 RE: Northlake 635 Business Park Lot 1 Block A, PSINet Dear Mr. Evans: The City of Coppell has reviewed the referenced plans and has the following comments to offer: 1. Demolition of the fire line and fire lane needs to be coordinated with the Fire Marshal. 2. The grading plan and drainage area map do not match for the landscaped area along the eastern edge of the property. This area needs to be picked up on-site as shown on the drainage area map. 3. If you are proposing a PVC system for the drainage off of the roof then you need to submit a letter to the City to request a variance to the 18" diameter RCP pipe requirement. 4. Provide a detail or specification for the oil-water separator. 5. Provide a written explanation to the engineering department describing the calculations for the oil-water separator. The rainfall intensity does not make sense on face value. 6. On the utility plan, indicate that one of the 2" domestic meters is existing and that the fire detector checks are existing. There are various other minor comments throughout the plans. When all comments have been addressed, please return these marked plans and tnvo sets of revised plans to the City for review. If you have any questions, please contact me at (972) 304-7019. Sincerely, Kent M. Collins, P.E. Civil Engineer