Raintree-CS 860403GINN, INC. CONSULTING ENGINEERS
April 3, 1986
Mr. Steve Morton
Ken E. Marchant Custom Homes, Inc.
1120 Metrocrest
Carrollton, TX 75006
Re: Raintree Village
Coppell, Texas
Dear Mr. Morton:
A final inspection of the above referenced project has been
confirmed by representatives of Ginn, Inc., M.U.D. #1, and
the City of Coppell.
Paving and utilities have been verified and are in compliance
with the City of Coppell standard requirements. As of this
date, permits can be issued to start construction of home
building.
Commitments to the streetscape-landscape plan should be
addressed within the phase of home building, along with the
screening walls.
The one-year maintenance bonds and as-built drawings have
been received from both contractors. Maturity on the bonds
will be one year from the date of this letter (4-3-86).
Sincerely,
Rand'y Flemi~7
Chief Inspector
/sr
cc: Ed Powell, City Engineer / Steve Goram, Public Works
Dale Jackson, Building Inspector
Per Birdsall, Street Department
Jeff Hawkins, M.U.D. #1
H. Wayne Ginn, P.E.