Loading...
Rejoice-LR 950922 ALPHA TESTING, INC. REPORT OF CONCRETE 2209 Wisconsin St. Suite 100 COMPRESSION TEST Dallas, Texas 75229 (214) 620-8911 TESTED FOR: CSX DATE OF ISSUE: SEPTF.~IBER 22, 1995 LEWI SVILLE, TEXAS PROJECT: RE3OICE LUTHERN CHRUCH OUR REPORTNO.' 95504-15 COPPELL, TEXAS FIELD DATA PAVING DRIVEWAY, 200' S. AND 160' E. LOCATION OF CONCRETE PLACEMENT FROM S.E. CORNER OF BLDG. DATE PLACED 0 9/1 4/95 PLANT 5 TIME 0 9 -' 4 5 DELIVER TICKET NO 9 0 1 6 6 SLUMP (ASTM C-143) 5 MIX PROPORTIONS (SSD) N/A AIR CONTENT (ASTM C-231 [] OR C-173 ~ 6 CEMENT N/A AIR TEMPERATURE 8 0 WATER N / A CONCRETE TEMPERATURE 8 5 FINE AGGREGATE N / A DATE RECEIVED 0 9 / 1 5 / 9 5 COARSE AGGREGATE N / A FIELD DATA SUBMI'I-rED BY [3M ADMIXTURE N/A MIX DATA SUBMI'I-I'ED BY KW-DX SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C-617 ~.r'13R C-1231 [] REMARKS COMPRESSION TEST RESULTS (NOMINAL CYUNDER SIZE 6" X 12") ~yiinders made by ALPHA (ASTM C-39) representative. ~ Cylinders made by Architect's LAB TYPE DATE AGE TOTAL AREA COMPRESSIVE or Contractor's representative. NO. CURING TESTED DAYS LOAD STRENGTH, PSI ~Cvlinders picked up by ALPHA laboratory. 21 LAB 09/22/95 8 122,710 28.27 4,340 _ ~ Cylinders delivered to ALPHA laboratory. 2 2 LAB .1. 0 / 1 2 / 9 5 2 8 15 2,080 2 8.2 ? 5,3 80 '~'~ompression test results comply with applicable specifications. 23 LAB 10/12/95 28 150,640 28.27 5,330 __ ~ Compression test results do not comply 2 4 LAB HOLD H 2 8.2 ? with applicable specifications. 28 3,000/ ~F/ / '//~es"l~ect f Mil Y S u b mi~///.~:::::~/''' Specifications / ~Es~~~ ~ D~ ~NER ALPHA TESTING, INC. REPORT OF CONCRETE 2209 Wisconsin St. COMPRESSION TEST suite 1 oo Dallas, Texas 75229 (214) 620-8911 TESTED FOR: CSI DATE OF ISSUE: SEPTENBER 22, 1995 LE~ISVILLE, TEXAS PROJECT: REJOI CE LUTHERN CHRUCH OUR REPORT NO.: 9550 4-14 COPPELL, TEXAS FIELD DATA PAVING DRIVEWAY, 200' S. AND 80' E. LOCATION OF CONCRETE PLACEMENT FROM S.E. CORNER OF BLDG. DATE PLACED 0 9/14 / 95 PLANT 5 TIME 08 -' 05 DELIVER TICKET NO 90151 SLUMP (ASTM C-143) 4.5 MIX PROPORTIONS (SSD) N/A AlE CONTENT (ASTM C-231 [] OR C-173 [~) 5 CEMENT N/A AIR TEMPERATURE 81 WATER N / A CONCRETE TEMPERATURE 8 5 FINE AGGREGATE N / A DATE RECEIVED 09/15/95 COARSE AGGREGATE N/A FIELD DATA SUBMI'i-rED BY PM ADMIXTURE N/A MIX DATA SUBMITTED BY RED l-MIA[~/ SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C-617 .'-'~"OR C-1231 -~ REMARKS COMPRESSION TEST RESULTS (NOMINAL CYUNDER SIZE S" X !2") ;~-'"'Cylinders made by ALPHA (ASTM C-39) representative. I~ Cylinders made by Architect's LAB TYPE DATE AGE TOTAL AREA COMPRESSIVE or Contractor's representative. NO. CURING TESTED DAYS LOAD STRENGTH, PSI I~'~CvCvlinders picked up by ALPHA laboratory. 17 LAB 09/22/95 8 117,970 28.27 4,170 u Cylinders delivered to ALPHA laboratory. 18 LAB 10/12/95 28 136,310 28.27 4,820 ~-- --'",- ~ression test results comply with 19 LAB 10/12/95 28 142,790 28.27 5,050 applicable specifications. [] Compression test results do not comply with applicable specifications. 20 LAB HOLD H 28 . 27 Specifications 2 8 3,000 espectfully Sub ' DA.,V21) P. STETTNER ALPHA TESTING, INC. REPORT OF CONCRETE 2209 Wisconsin St. COMPRESSIONTEST suite 100 Dallas, Texas 75229 (214) 620-8911 TESTED FOR: CSI DATE OF ISSUE: SEPTEMBER 22, 1995 LEW I SV I LLE, TEXAS PROJECT: RE JO I CE LUTHERN CHRUCH OUR REPORT NO.: 95504 - 14 COPPELL, TEXAS FIELD DATA PAVING DRIVEWAY, 200' S. AND 80' LOCATION OF CONCRETE PLACEMENT FROM S.E. CORNER OF BLDG. DATE PLACED 0 9/1 4/95 PLANT 5 TIME 0 8 '- 0 5 DELIVER TICKET NO 90 1 51 SLUMP (ASTM C-143) 4.5 MIX PROPORTIONS (SSD) N/A AIR CONTENT (ASTM C-231 [] OR C-173 [~) 5 CEMENT N/A AIR TEMPERATURE 81 WATER N / A CONCRETE TEMPERATURE 8 5 FINE AGGREGATE N / A DATE RECEIVED 0 9 / 1 5 / 9 5 COARSE AGGREGATE N / A FIELD DATA SUBMI'I-rED BY PM ADMIXTURE N/A M~X DATA SUBMrUI'EO BY RED I -MI Y/ SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C-617 [~'OR C-1231 ,~. REMARKS COMPRESSION TEST RESULTS (NOMINAL CYUNDER SIZE 6" X 12") ;,~Cyfinders made by ALPHA (ASTM C-39) representative. [] Cylinders made by Architect's LAB TYPE DATE AGE TOTAL AREA COMPRESSIVE or Contractor's representative. NO. CURING TESTED DAYS LOAD STRENGTH, PSI ----_Z~Cvlinders picked up by ALPHA laborato~J. 17 LAB 09/22/95 8 117,970 28.27 4, ].70 "-' Cylinders delivered toALPHA laboratory. 18 LAB 10/12/95 28 28.2? [] Compression test results comply with 19 LAB 10 / 12 / 95 28 28.27 applicable specifications. ~' Compression test results do not comply with applicable specifications. 20 LAB HOLD H 28.27 Specifications 28 3,000 ~l:~ectfully Submitted ~..~JA TESTING, INC. DAVID P. STETTNER