Loading...
Rejoice-CS 960319 COPPELL ENGINEERING IrllLITlg~ DIVISION MEMORANDUM DATE: March 19, 1996 TOt l~trry Davis~ Constructor Inspector FROM~ Curtis Jordan, Utilities Division RE: Walk thru for Rejoice T.uthernn Church A walk-thru on the above referenced project was conducted on March 15, 1996 and the items below were found to b~ deficient. Ctlirane, y st'-~! needs to b~ til, htcrted on botto~. 2. Need 6" cl~n out plug. Plea.sc ensure that these items get taken care of and if you have any questions, please give me a call. walkthru