Loading...
Rejoice-CS 950821August 21, 1995 Carlos Mendes Rejoice Lutheran Church FAX # 219-0351 RE: Rejoice Lutheran Church Development Fee Assessment Dear Mr. Mendes: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for Rejoice Lutheran Church. Please make payment to the City of Coppell in the amount of $6,750.00 and forward it to Alan Johnson, Finance Director, along with a copy of the Fee Assessment List. The remaining fees, as shown on the fee list, should be paid as specified. Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely. Kenneth M. Griffin, P.E. Asst. City Manager/City Engineer cc: Alan Johnson, Finance Director Doug Stevens, Engineering Technician Howard Pafford, Utilities Superintendent Greg Jones, Chief Building Official Per Birdsall, Interim Street Superintendent Rick Wieland. Parks and Recreation Manager CITY OF COPPELL DEVELOPMENT FEES Date: August 21, 1995 Project: Rejoice Lutheran Church · TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee S4,500.00 S4,500.00 (100% due prior to Council Approval) Water Yap Inspection Fee $300.00 -0- (100~ due at Issuance of Water Meter) Wastewater Impact Fee S2,250.00 $2,250.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee -0- -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 -0- (100fie due at Issuance of Building Permit) Water Meter Fee (Domestic) $129.05 -0- (100% due at Issuance of Water Meter) Water Meter Deposit (Non-residential) S70.00 -0- (100% due at Issuance of Water Meters) Water Meter Fee (Irrigation & Fire) $2A24.25 -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit $35.00 -0- (100% due at Issuance of Water Meters) Street Sign Fee -0- -0- (100% due prior to Acceptance of Project) Street Light Fee * information not -0- (100% due prior to Acceptance of Project) available Park Fee -0- -0- Street Escrow (CC waived escrow -0- (100~ due prior to Council Approval) at 11/8/94 meeting) Construction Inspection Fee need submittal of -0- (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $ 9,758.30 TOTAL AMOUNT DUE PRIOR TO COI~'NCIL APPROVAL S 6,750.00 * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted. S292.60 per light will be assessed. COPPELL ENGINEERING MEMORANDUM DATE: August 18, 1995 TO: Mike Martin, E.I.T. FROM: Howard Pafford, Utilities Superintendent RE: Development Fees for Rejoice Lutheran Church The following fees should be assessed and collected on the above referenced project. Water Impact Fee: ! - 1 1/2" Domestic Merer/s = 5 ESU's 1 - 1" Irrigation Meter/s = 2.5 ESU's 1 - 8" Fireline Meter/s = 2.5 ESU's Total 10 ESU's ~ $450.00 ea = $ 4,500.00 100% due prior to Council approval of the final plat. Wastewater Impact 1 - 1 1/2" Domestic Meter/s = 5 ESU's Total 5 ESU's ~ $450.00 ea = $2,250.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 3 Connections ~ $100.00 each = $ 300.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Development Fees Page 2 Utility Final Inspection Fee (Ail Development) 1 lots ~ 5 50.O0/lot = 550.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 1 - 1 1/2" Domestic Meters ~ 5129.05ea = $129.05 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 1 - 1" Irrigation Meter/s .~ $ 46.05 ea = $46.05 1 - 8" Fireline Meter/s.~ ~ 5 2.378.20 ea = $2.378.20 Total $ 2. 424.25 100% due prior to issuance of ~;ater ?.eter/s. Water Meter Deposit (Multi-Family or Non-Residential) 2 Meters ~ 535.00 ea = $70.00 100% due prior to issuance of water meters. Irrigation Meter Deposit 1 Meters ~ $35.00 ea = $35.00 100% due prior to issuance of water meters. ESCROW / ROADWAY IMPACT FEE CALL t~LATIONS PROJECT: Rejoice Luthern Church DATE: 8/16/95 STREET ESCROW: Street Name(s) Sandy Lake Road .Street Type C4D Cost per Foot $160.00 Length of Adjacent Frontage (Linear Feet) 296.63 Escrow due = (Cost per Foot) x (Length of Adjacent Frontage) = $47,460.80 ROADWAY IMPACT FEE: iServicc Area * 2 iCategory ** Institutional 'Land Use ** Church/Synagogue Building Size (Sq. Ft.) 8,926 Development Units ** 8.926 Vehicle Miles per Development Unit ** 0.52 Fee per Vehicle Mile : $300 Roadway Impact Fee due = (Development Units) x I(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $1,392.46 · (Figure 2 - Roadway Impact Fee Study) · * (Table 3 - Roadway Impact Fee Study) Amount due is the lesser of the Street Escrow or the Roadway Impact Fee. this proposal. There were none. The Mayor then asked for those persons wishing to speak in favor of this proposal. Robert B. Rollins, Applicant, 13760 Noel Road #620, Dallas, TX 75240 was present to answer questions from Council. Mayor Pro Tern Robertson moved to close the Public Hearing and approve the replat of River Ridge Addition to add landscape common area //5 and drainage easement (15' wide and 1,995' long), located at the southwest corner of Sandy Lake Road and Riverchase Drive, next to the DP & L easement, at the request of R.B.R. Properties, Inc. Councilmember Mayo seconded the motion; the motion carried 6-0 with Mayor Pro Tem Robertson and Councilmembers Alexander, Watson, Reitman, Mayo, and Sheehan voting in favor of the motion. 13. PUBLIC HEARING: Consideration and approval of S-1086, Rejoice Lutheran Church, zoninr ehant, e from SF-12 (Sinrle Family -12) to SF-12- S.U.P. (Sinole Family-12, Special Use Permit to allow construction of a church to be located on the north side of Sandy Lake Road, approximately 600' east of Lodge Road, at the request of Halff Associates, Inc. Gary Sieb, Director of Planning and Community Services, made a presentation to the Council. Mayor Morton opened the Public Hearing and asked for those persons wishing to speak against this proposal. There were none. The Mayor then asked for those persons wishing to speak in favor of this proposal. Kenneth W. Hovland, Applicant, 720 Michelle Place, Pastor of Rejoice Lutheran Church, addressed the Council. Mayor Pro Tem Robertson moved to close the Public Hearing and approve S-1086, Rejoice Lutheran Church, zoning change from SF-12 (Single Family-12) to SF-12-S.U.P. (Single Family 12-S.U.P), subject to the Applicant working with homeowners on maintenance of the fence on the north side and waiving of the screening wall requirement on the western boundary of the property. Councilmember Sheehan seconded the motion; the motion carried 6-0 with Mayor Pro Tern Robertson and Councilmembers Alexander, Watson, Reitman, Mayo, and Sheehan voting in favor of the motion. 14. Consideration and approval of Rejoice Lutheran Church, Preliminary Plat, to be located on the north side of Sandy Lake Road, approximately 600' east of Lodge Road, at the request of Halff Associates, Inc. Gary Sieb, Director of Planning and Community Services, made a presentation to the Council on Churches waiving escrow fees for road assessments. Mayor Pro Tem Robertson moved to approve Rejoice Lutheran Church, Preliminary Plat to be located on the north side of Sandy Lake Road, approximately 600' east of Lodge Road at the request of Halff and Associates and to wive the paving assessment for Sandy Lake Road. Councilmember Reitman seconded the motion; the motion carried 6-0 with Mayor Pro Tern Robertson and Councilmembers Alexander, Watson, Reitman, Mayo, and Sheehan voting in favor of the motion. EXECUTIVE SESSION (Closed to the Public) 15. Reconvene Executive Session A. Section 551.072 Deliberation regarding.real property 1. Land acquisition - Sandy Lake Road B. Section 551.075 Conference with employees 2. Conference with City Employees regarding Sandy Lake Road Mayor Morton convened into Executive Session at 8:20 p.m. as allowed under the above-stated article. Mayor Morton adjourned the Executive Session at 9:21 p.m. and opened the Regular Session. CM 110894 Page 5 of 6