Loading...
Rejoice-CS 940929 DEVELOPMENT REVIEW COMMITTE ENGINEERING COMMENTS ITEM: S-1086, Rejoice Lutheran Church, Zoning Change from SF-12 (Single Family-12) to SF-12 S.U.P. (Single Family-12, Special Use Permit), to allow construction of a church to be located on the north side of Sandy Lake Road, approxitnately 600' east of Lodge Road, at the request of Halff Associates, Inc. DRC DATE: September 29, 1994 CONTACT: Ken Gtif~n, P.E., Assistant City Manager/City Engineer (393-1016) INITIAL ./PRELIMINARY FINAL 1. There could be some potential drainage issues on the west side of the site once the education building is constructed. This should be evaluated. ENGINEERING COMMENTS ITEM: Rejoice Lutheran Church, Preliminary Plat, to be located on the north side of Sandy Lake Road, approximately 600' each of Lodge Road, at the request of Halff Associates, Inc. DRC DATE: September 29, 1994 CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer (393-1016) 1. Drainage plans and utility plans should be submitted. 2. The right-of-way should be shown to be dedicated not "proposed". 3. Escrow will be required for Sandy Lake Road. If the applicant chooses to attempt to get the requirement waived it will require Council action. 4. The volume and page of the 15'x15' drainage easement on the north side of the site should be provided. 5. The 50' access easement between lots 20 and 21 of Pecan Valley has been abandoned. If so, it should be corrected as shown on the plat. 6. What provisions will be provided with the development of this church to insure that the property is not accessed via the alley in Pecan Valley? Will a screening wall be built across the alley? DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Rejoice Lutheran Church, Preliminary Plat, to be located on the north o"ide of Sandy Lake Road, approximately 600' each of Lodge Road, at the request of Halff Associates, Inc. DRC DATE: September 29, 1994 CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer 093-1016) INITIAL PRELIMINARY ./'FINAL 1. Drainage plans should be submitted. They should include all off-site drainage areas. 2. Escrow will be required for Sandy Lake Road. If the applicant chooses to attempt to get the requirement waived it will require Council action. DEVELOPMENT RF~ VIEW COMMI~EE ENGINEERING COMMENTS ITEM: S-1086, Rejoice Lutheran Church, Zoning Change from SF-12 (Single Family-12) to SF-12 S.U.P. (Single Family-12, Special Use Permit), to allow construction of a church to be located on the north side of Sandy Lake Road, approximately 600' east of Lodge Road, at the request of Halff Associates, Inc. DRC DATE: September 29, 1994 CONTACT: Ken Griffin, P.E., Assistant CRy Manager/City Engineer (393-1016) 1. No Comments.