Freeport NIP(7.5)-CS010917 T H E: C ! T Y 0 F'
COPP-EI £
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To: Ken Griffin, Director of Engineer ing
...... ~> Glenn Hollowell, Asst. Director of Public Works
o Greg Jones, Chief Building Official
o Travis Crump, Fire Marshal ~
From: Larry Davis, Construction Inspector~~/~
Date: September 17, 2001
RE: WALK-THRU for Freeport IX
A final walk-thru for streets, utilities and drainage on the referenced project has been
scheduled for Thursday, September 27, 2001 at 8: 30 a.m.
If I can be of further assistance please let me know.
cc: o Lee Stone, Commercial Inspector
o Roland Asebedo, Asst. Fire Marshal
-;> Butler Construction, Gary Green fax 817-267-1902
....... ~ Potter Concrete fax 214-689-1066
...... ~-~-:,Tri-Dal, Ltd. fax 817-481-8195
o i~lecse ol;st r'~b~¢e
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"