Loading...
Freeport NIP(7.3)-CS01091909/19/01 08:56 CITY OF COPPELL ~ 9?2 ~04 7041 N0.44~ ~01 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: Larry Davis, Construction ~or Engi~eering From: Danny H~ghtower, Utilities Division Public Works Date: September 19, 2001 RE: Walk-thr~ Freeport VH 611 South Royal 9/18/01 1, Reset WAD mnnhole and grout imlde. 2. 2'" FIE on east side of build~g ks dripping. 3. 4m FH on east side of building is leaking. 4. Cle~n drainage for vault at southwest vault or raise vault door, 5. Need cap cover for F'we Department. 6. At 2~ vault mark FLY not FItV on pad. Replace irrigation box to metal meter can on DC. 8. Need paperwork on 2 vaults tested DDC. 9. Repair .chain on FH northwest of building. 10. Remove dirt and flush with ground, around irrigation DC at 24 vault. 11, 2"~ FH ;~.orth of budding paint valve stack lid red and clean valve stack of dirt and Note: For questions or when ready for re-walk call 972-304-3.~C~, Danny H~htower.