Loading...
Freeport NIP(7.3)-CS010913 REVISED MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Ken Griffin, Director of Engineering ~,/Glenn Hollowell, Director of Public Works ¢ Greg Jones, Chief Building Official ~f Travis Crump, Fire Marshal From: Larry Davis, Construction Inspector~/f~ Date: September 13, 2001 RE: WALK-THRU for Freeport VII A final walk-thru for streets, utilities and drainage on the referenced project has been scheduled for Tuesday, September 18, 2001 at 8:30 a.m. IfI can be of further assistance please let me know. cc: g5 Lee Stone, Commercial Inspector j2f Roland Asebedo, Asst. Fire Marshal v/Brace Harris, Raymond Construction 972-980-6770 "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"