Loading...
Reserve-CS000111 9729319538 · tm Kent Collins Frmm Daniel Heischman Fag~ 972-304-3570 l~agem 10 Phmtm g72-304-3681 Oatm 01111/00 Rm ~ I~ Bill Anderson Junclion Box John Papagoios n Uegent [] For Review [] Please 4:~, ,mo.d. [] Plmlam ReIMy [] Please · ~: The following sheets show the methods and the calculations used in designing the proposed junction box along Bethel Road for the Resewe Subdivision. Please feel free to contact me if you have any comments and/or questions. AREA AREA C TC I100QIO0 COMMENTS t~ (Ac.) (min.) (in)hr) (cfs) . 1 1.3 0.55 10 8.88 6.5 10' CURB INLET 2 1.2 0.55 10 8.88 5.9 4'X4' "Y"INLET 5 2.5 0.55 10 8.88 11.2 14'CURB INLET 4 I0.8 0.55 10 8.88 5.9 10'CURB INLET 5 I~.~ I 0.55 ! 10 I 8.8s 1'6.~I10' CURB INLET RAINFALL INTENSITIES FROM HYDRO-55 ~ · AREA (AC.)  GlO0 (c.f.s.) Or.,..I -- 33.'70 . 'i .~' "l ~'~ ~ ' ~ ........... '~' ~"'.-"-' -:~--'.- --- ~ ~.-" . .,,~..~ ~ ............. ~ ~".-~...-'-: ;~-~;.;~ '~.-'~' -~. -". '.-' -" ~"..' m ... ~ ........ ' .-' :".-' ~' .~. .- . '1 .....'. ~.-. . .....d ....... ~.,._,,'.-, ~. ., ,~ .' 01/11/00 TUE 14:24 FAX 9729319538 DOWDEY ANDERSON ASSOC ~008 GIVEN: Existln~ Conditions C~s -- 0.38 I~oo = 8.88 iz~hr A = 5.63 Ac. Qi00= 19.00 els Outflow Structure - (2) 21" RCP's - FL 489.20 Provosed Conditions C = 0.55 I ~00 = 8.88 in/hr A=6.9Ac. Q,00 = 33.70 cfs Design Sunction Box so flow out of the 2-21" RCP's equ__s_!s existing conditions. Additional flow will go to bar ditch via opening in junction box. For Q = 19 els (out of culverts), headwater depth = 21" (HW/D = ---1 - see homograph) Flow into ditch - Q~00 = 14.7 cfs Using Weir formula, design size of junction box opening Weir formula, Q = 3.087 LH 3/2 => Q = 14.7 For L = 5', H = 1' (0.97 rounded) Q = 3.087 LH 3/2 14.7 cfs = 3.087 (5') 3/2 H 3/2 -- 14.7/(3.087) (5) H = 0.97' Comments: By taking the area that flows into the culverts prior to development, I calculated a Q~0o of 19.00 els. The proposed conditions would have 33.70 els flowing through the (2) 21" culverts. The junction box is designed to produce a head that will allow only 19.0 els through the culverts with the _r~rnalnlng flOW exiting the junction box through an opening on the east side. This remaining flow will travel down the bar ditch and into the creek. 01/11/00 TUE 14:25 FAX 9729319538 DOWDEY ANDERSON ASSOC ~009 The headwater depth was determined usin~ the ettsche~ homograph (taken f~m TxDOT Bridge Division Hydraulic Manual). Given a diameter of 21" and a flow of 9.5 cfs (per pipe), a HW/D ratio of 1.0 was determined. Thus, a head of 1.75' (2I") is needed to allow 9.~ cfs throush each culvert. Then using the Weir formula, the size of the openin~ needed to keep the waterhead depth at 1.75' and allow the remslnlng 14.7 cfs to exit the junction box was determined. ThrouF, h trial and error, a 5' x I' opening is needed. And so, the junction box is designed nccordin__F, ly. 01/11/00 TUE 14:25 FAX 9729319538 DOWDE¥ ANDERSON ASSOC ~010 f~ - 18o - io~ooo ~- III - I,ooo EXAMPLE ( I ) (2) (3) - 6,~ ..... ' ~ · -I~ ~ · -- ' - -- 4,~ ~t flW -- 8. . -- S.. .. - IB~ - ~ fm ' ~ ~ B~ O] LS i.8 ~ ~' ~ ' .-- 4.. _,. , - -- -60 o~i~ / m~15 ' ~ ffi 7 SO HW ENTRANGE ~ - o _ 40 ~ SGALE TYPE ~-- i.o - ~ ~ e,~. M - .o ~ / ~, b,b.,t.,, ,..NS, (,), t~,, ..... / fie llrdgk, inollned fin / ~ 4 D Nd O ,eileo, w reverse se -- .6 -- .6 ¢ ~ ~ ilJ~tr~tod. -- 15 -- .5 -- .5 ' ~ ~.0 -- .5 -,a HEADWATER DEPTH FOR GONGRETE PIPE GULVERTS ( FHWA WITH INLET CONTROL ~ I BRIDGE DIVISION HYDRAULIC MANUAL 12