Reserve-CS 991110 P.O. Box 478 -
Coppell. Texas 75019
972-462-OO22
The City With A Beautiful Future
P.O. BOX 478
COPPELL, TEXAS 75019
November 10, 1999
John Papagolos
5225 Village Creek Drive Suite 360
Piano, Texas 75093
The Reserve
Fee Assessment l.,etteF
Park Development Zone: Zone 1
Dear Mr. Papagolos:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with
a copy of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $67,440.00 and forward to
the Finance Department along with a copy of the Fee Assessment table. This amount is a
portion of the assessed fees that need to be paid prior to Council approval. Please refer to
the attached table for additional fees. Also provide a copy of the Engineer's estimate or
contract to our office so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to
verify the payment of required fees and insure a successful beginning of this project. We
look forward to working with you on this project. If you have any questions, please
contact me.
Sincerely,
Kent M. Collins, P.E.
Civil Engineer
cc: Jennifer Armstrong, Finance Director
Doug Stevens, Engine~-~'ing Technician
Glenn Hollow¢ll, Assistant Director of Public Worl~
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
DEVELOPMENT FEE TABLE
Project: The Reserve
Date: 11/lO/1999
TOTAL AMOUNT DUE
FEF3 DUE PR/OR TO
COUNCIL
APPROVAL
Water Impact Fee $13,050.00 ~ '- $1'3,050.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $1,100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $539.07
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $192.05
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $735.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $9,450.00 $9,450.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $1,050.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $1,050.00
(100% due at Issuance of Building Permit)
Park Fee $26,985.00 $26,985.00
(100% due prior to Council Approval)
Roadway Impact Fee $17,955.00 $17,955.00
(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project ]1
Street Sign Fee 'Information not Available
(100% due prior to Acceptance of Project
Construction Inspection Fee Information not Available
TOTAL $72,136.12
TOTAL AMOUNT DUE I/RIOR T° cOUNCiL APPROVAL $67,440.00
DEVELOPMENT FEE WORKSHEET
PROJECT: The Reserve
DATE: 11/10/1999
Water Impact Fee:
Domestic Meter(s): 21 - 5/8 inch X 3/4 inch = 21 ESU's
Irrigation Meter(s): 1 - 2 inch = 8 ESU's
0 = 0 ESU's
Fireline Meter(s): 0 = 0 ESU's
Total #: 29 ESU's ~ $450.00 ea. $13,050.00
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total 0: 22 Connections ~ $50.00 ea. $1,100.00
(Single family due prior to issuance of building permit)
(Ail other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total 0: 21 Domestic Meter(s) ~ $25.67 $539.07
(Single family due prior to issuance of building Permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: I Irrigation Meter(s) ~ $192.05 $192.05
Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00
Total #: 0 Fireline Metar(s) ~ $0.00 $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 21 Meter(s) ~} $35.00 ea. $735.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) ~ $30.00 ea. $30.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 21 ~ $450.00 ea. $9,450.00
Wastewater Tap Inspection Fee:
Total #: 21 Connections ~ $50.00 ea. $1,050.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 21 Lots ~ $50.00 ea. $1,050.00
(100% due prior to issuance of building permit)
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
Park Development Zone: Zone 1
21 Single-family ~} $1,285.00 par lot $26,985.00
0 Multi-family ~ $1,285.00 per unit $0.00
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations) $17,955.00
Street Lighting Fees:
Assessed for lighting in the City's right-of-way. Information not Available
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the propo'-~K! development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way. Information not Available
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment. Information not Available
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
P~e2
ROADWAY IMPACT FEE CALCULATIONS
PRO3ECT: T~e Reset'vt
DATE: 11/10/1999
ROAI~WAY IMPAfYF
~:~' ** Residential
~ Use ** Single-Family Detached
~'~[,. Lots/'Onits 21
I~;~.'~.o~,~.i,,;.~,~ Units ** 21.00
2.85
$300
Roadway Impact Fee due - (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) -- $17,955.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)