Loading...
Phillips Addition-CS 781019COttlEULTIN¢; EN~INEER,~ 4~6c~ BELT UNE R~ctD ~,~l..~ TE.X~$ 75~.~4~ TEL ,~14 66f Bf~E~7 Mr. David Phillips Box 1 04 Coppell, Texas 75019 Re: Proposed Site Work for David Phillips Dear David: We have reviewed the proposed cut and fill operations that ~ou propose on the property at Meadow Creek Road. In reviewing the drawing dated.. September 11, 1978, we conclude that the proposed finish grades are within the acceptable standards for cut and fill operations. We understand that all sloped areas will have a maximum slope of 3:1 and that all existing grades at adjacent property lines will be maintained. We conclude, based upon. the existing condition of the site that the cut and fill operations that are proposed will not create any additional hazards to the adjacent propertg, since at the present time there is an existing steep bank due to the earlier cut and fill operation. Therefore, the proposed operation will be beneficial in reducin9 the ~azards at the existing site. If we can be of additional assistance, please call.