Phillips Addition-CS 781019COttlEULTIN¢; EN~INEER,~ 4~6c~ BELT UNE R~ctD ~,~l..~ TE.X~$ 75~.~4~ TEL ,~14 66f Bf~E~7
Mr. David Phillips
Box 1 04
Coppell, Texas 75019
Re: Proposed Site Work for David Phillips
Dear David:
We have reviewed the proposed cut and fill operations that ~ou propose
on the property at Meadow Creek Road. In reviewing the drawing dated..
September 11, 1978, we conclude that the proposed finish grades are within
the acceptable standards for cut and fill operations. We understand that
all sloped areas will have a maximum slope of 3:1 and that all existing
grades at adjacent property lines will be maintained.
We conclude, based upon. the existing condition of the site that the cut
and fill operations that are proposed will not create any additional hazards
to the adjacent propertg, since at the present time there is an existing
steep bank due to the earlier cut and fill operation. Therefore, the
proposed operation will be beneficial in reducin9 the ~azards at the existing
site.
If we can be of additional assistance, please call.