Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Northlake WE P10B-CR 940907
t~O-- -- C~q~ULTING ENGINEERS T~IZQ~e Environmenta[ Assessments Z~e SoiLs & Fou~ations Construction Nateriats Testing "ExceLLence by Ex~rience" C~rciaL & I~ustria[ ins~ction PO Box ~25~8 · SouthLake, Texas 76092 · (817) 32g-0281 DAILY CONSTRUCTION REPORT PROJECT: Northlake Woodlands #10, Ph B LOCATION: Coppell JOB #: 94-1104 DATE: 09-07-94 DAY: Wednesday TIME: 6:30a-5:p CLIENT: Fircon Venture Ltd CONTRACTOR: Site Concrete ACTIVITIES: WEATHER: Partly Cloudy; Hot LOW TEMP: 37 F HIGH TEMP: 90 F Travelled to job site, as requested, to make concrete test cylinders. Eight (8) sets of four (4) cylinders were made. Also picked up 20 concrete cylinders made on 09-06-94, Returned to office. SET #11 LOCATION: Condor Drive @ Station 8+00 SLUMP: 3.25" AIR: 4.8% TEMP: AT 77/CT 81 TIME: 7:30am SET #12 LOCATION: Condor Drive @ Station 5+50 SLUMP: 2.25" AIR: 5.0% TEMP: AT 78/CT 81 TIME: 9:00am SET #13 LOCATION: Condor Drive @ 3+00 SLUMP: 3.0" AIR: 4.7% TEMP: AT 80/CT 82 TIME: 10:30am SET #14 LOCATION: Red Wing Drive @ Station 2+00 SLUMP: 3.25" AIR: 5.1% TEMP: AT 84/CT 85 TIME: 12:00noon SET #15 LOCATION: Red Wing Drive @ Station 4+50 SLUMP: 3.50" AIR: 5.0% TEMP: AT 84/CT 85 TIME: l:00pm Page 2 _ --~ 94-1104 09-07-94 SET ~16 LOCATION: Red Wing Drive @ Station 7+00 SLUMP: 2.75" AIR: 4.7% TEMP: AT 85/CT 87 TIME: 2:00pm LOCATION: Red Wing Drive @ Station 9+50 SLUMP: 3.0" AIR: 4.8% TEMP: AT 85/CT 87 TIME: 3:00pm SET #18 LOCATION: Willet Drive @ Station 2+50 SLUMP: 2.50" AIR: 5.0% TEMP: AT 84/CT 86 TIME: 4:30pm REMARKS: *Set #17 destroyed on site. Patrick Corbett Technician