Loading...
Northlake WE P10B-CR 940906 G~O- -- C'"~SULTING ENGINEERS IN= ~l~e Environmental Assessments ~{~* Soils & Fou~ations Construction Hateria[s ~esting "Excettence by Ex~rience', C~rciat & l~ustriat lns~ction PO Box 92548 * South[ake, Texas 76092 * (817) 329-0281 DAILY CONSTRUCTION REPORT PROJECT: Northlake Woodlands #10, Ph B LOCATION: Coppell JOB #: 94-1104 DATE: 09-06-94 DAY: Tuesday TIME: 7a-6pm CLIENT: Fircon Venture Ltd CONTRACTOR: Site Concrete ACTIVITIES: WEATHER: Partly Cloudy; Hot LOW TEMP: 72 F HIGH TEMP: 92 F Travelled to job site, as requested, to make concrete test cylinders. Five (5) sets of four (4) cylinders were made. Returned to office. SET #6 LOCATION: Falcon Court @ Station 1+00 SLUMP: 3.0" AIR: 4.7% TEMP: AT 82/CT 78 TIME: 10:30am SET #7 LOCATION: Falcon Drive @ Station 9+00 SLUMP: 2.75" AIR: 4.9% TEMP: AT 94/CT 88 TIME: 12:30pm BET #8 LOCATION: Falcon Drive @ 11+50 SLUMP: 3.25" AIR: 5.1% TEMP: AT 97/CT 90 TIME: l:30pm SET #9 LOCATION: Condor Drive ~ ~tation 12%00 SLUMP: 2.50" AIR: 4.8% TEMP: AT 98/CT 91 TIME: 3:30pm BET #10 LOCATION: Condor Drive @ Station 9+50 SLUMP: 3.00" AIR: 5.0% TEMP: AT 93/CT 87 TIME: 5:30pm Patrick Corbett Technician