Loading...
Northlake WE P10B-LR 941005 (2) G~O- -- CO}'"'TLTING ENGINEERS IN: T~~e ~nvironmenta[ Assessments ~ Soits & Fou~ations Construction Hateria[s Testing "Exce[tence by Ex~rience" C~rcia[ & l~ustria[ ]ns~ction PO 8ox 92548 · South[a~e, Texes 76092 · (817) 329-0281 FIELD COMPACTION REPORT PROJECT: Northlake Woodlands #10, Phase B LOCATION: Coppell JOB #: 94-1104 DATE: 10-05-94 DAY: Wednesday TIME: 9:30am CLIENT: Fircon Venture LTD CONTRACTOR: Site Concrete c/o Tipton Engineering WATER DRY PER- TEST PROCTOR CONT. DEN CENT NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP Block C: 1. @ Lot 12 FG 2 25.4 95.6 97.9 2. @ Lot 14 FG 2 27.2 94.8 97.1 3. @ Lot 18 FG 1 18.6 103.7 97.0 4. @ Lot 16 FG 1 17.8 104.1 97.4 Block D: 5. @ Lot 9 FG 2 26.4 95.1 97.4 6. @ Lot 11 FG 1 16.8 102.4 95.8 REMARKS: Al!. test passed. Minimum Compaction ~equired: 95% FG = Final Grade PROCTORS: 1. Brown Silty Clay 106.8 PCF @ 17.3% MOISTURE 2. Tan & Brown Clayey Sand 97.6 PCF @ 25.1% MOISTURE Patrick Corbett Technician ~-. -- CON"~LTZNG ENGINEERS IN= T~XQ~,_ .,',vi ror~enta t Assessments ~l(~ Soits & Foundations Construction Materials Testing "Excellence by Experience" Commercial & l~ustria[ Ins~ction PO Box 92548 · South[ake, Texas 76092 * (817) 329-0281 CONCRETE CYLINDER TEST RESULTS PROJECT: Northlake Woodlands #10, Phase B LOCATION: Coppell JOB #: 94-1104 DATE OF BREAK: 10-05-94 DAY: Wednesday CLIENT: Fircon Venture LTD CONTRACTOR: Site Concrete c/o Tipton Engineering CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) S~MPLE AGED POUNDS PSI Condor Dr: 11 C @ Station 8+00 3.25" 09-07-94 28 93,000 3290 11 D @ Station 8+00 3.25" 09-07-94 28 93,500 3307 12 C @ Station 5+50 2.25" 09-07-94 28 97,000 3431 12 D @ Station 5+50 2.25" 09-07-94 28 96,500 3414 13 C @ Station 3+00 3.0" 09-07-94 28 98,500 3484 13 D @ Station 3+00 3.0" 09-07-94 28 97,500 3449 Red Wing Dr: 14 C @ Station 2+00 3.25" 09-07-94 28 95,000 3360 14 D @ Station 2+00 3.25" 09-07-94 28 95,500 3378 15 C @ Station 4+50 3.5" 09-07-94 28 91,500 3237 15 D @ Station 4+50 3.5" 09-07-94 28 92,500 3272 16 C @ Station 7+00 2.75" 09-07-94 28 90,500 3201 16 D ~ ~'~ ' .... ~1 .... ?+00 2.75~ u9-07-9~ 2~ 92,500 3272 17 C @ Station 9+50 3.0" 09-07-94 28 set destroyed 17 D @ Station 9+50 3.0" 09-07-94 28 on site Willet Dr: 18 C @ Station 2+50 2.5" 09-07-94 28 93,500 3307 18 D @ Station 2+50 2.5" 09-07-94 28 94,000 3325 SPECIFICATIONS: 3000 psi @ 28 days SUPPLIER: Patrick Corbett Technician