Loading...
Northlake WE P10B-LR 941004 G~O- -- CONF--'~TING ENGINEERS IN: ~I~ :ironmentat Assessments X~, Soils & Fou~atJons Construction Materiats Testing "ExceL[ence by Ex~rience" C~rcia[ & I~ustria[ Ins~ction PO 8ox 92548 · South[ake, Texas 76092 * (817) ]29-0281 CONCRETE CYLINDER TEST RESULTS PROJECT: Northlake Woodlands #10, Phase B LOCATION: Coppell JOB #: 94-1104 DATE OF BREAK: 10-04-94 DAY: Tuesday CLIENT: Fircon Venture LTD CONTRACTOR: Site Concrete c/o Tipton Engineering CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) SAMPLE AGED POUNDS PSI Falcon Ct: 6 C @ Station 1+00 3.0" 09-06-94 28 97,500 3448 6 D @ Station 1+00 3.0" 09-06-94 28 98,000 3467 Falcon Dr: 7 C @ Station 9+00 2.75" 09-06-94 28 93,000 3290 7 D @ Station 9+00 2.75" 09-06-94 28 93,500 3307 8 C @ Station 11+50 3.25" 09-06-94 28 93,500 3307 8 D @ Station 11+50 3.25" 09-06-94 28 94,500 3343 Condor Dr: 9 C @ Station 12+00 2.5" 09-06-94 28 97,500 3448 9 D @ Station 12+00 2.5" 09-06-94 28 96,000 3396 10 C @ Station 9+50 3.0" 09-06-94 28 94,500 3343 10 D @ Station 9+50 3.0" 09-06-94 28 95,000 3360 SPECIFICATIONS: 3000 psi @ 28 days BUPPLIER: Patrick Corbett Technician