Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Northlake WE P10B-LR 940916
~i~-' -- CON~LTING ENGINEERS IN= T~Q~, ,vironmenta[ Assessments Z~, Soils & Foundations Construction Nateria[s Testing ,,ExcettencebyExperience" Comnerciat & l~ustria[ lns~ction PO Box 92548 · South[ake, Texas 7~0~2 · (817) 3~9-0~81 CONCRETE CYLINDER TEST RESULTS PROJECT: Northlake Woodlands #10, Phase B LOCATION: Coppell JOB #: 94-1104 DATE OF BREAK: 09-16-94 DAY: Friday CLIENT: Fircon Venture LTD CONTRACTOR: Site Concrete c/o Tipton Engineering CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) SAMPLE AGED POUNDS PSI Alley A: 20 A @ Station 13+00 2.5" 09-09-94 7 82,500 2918 20 B @ Station 13+00 2.5" 09-09-94 7 81,000 2865 21 A @ Station 8+00 3.0" 09-09-94 7 83,500 2953 21 B @ Station 8+00 3.0" 09-09-94 7 82,000 2900 Alley B: 22 A @ Station 3+00 2.75" 09-09-94 7 82,500 2918 22 B @ Station 3+00 2.75" 09-09-94 7 81,500 2882 SPECIFICATIONS: 3000 psi @ 28 days SUPPLIER: Patrick Corbett Technician