Loading...
Northlake WE P10B-LR 940914 G~O-- ~ CONSa~LTING ENGINEERS T~(~I~F~Q~e ,vironmentat Assessments ~. Soits & Foundations Construction HateriaLs Testing ,,ExceL[ence byExperience" Commercial & lndustriat Inspection PO Box 92548 · Southtake, Texas ?6092 · (817) 329-0281 CONCRETE CYLINDER TEST RESULTS PROJECT: Northlake Woodlands #10, Phase B LOCATION: Coppell JOB #: 94-1104 DATE OF BREAK: 09-14-94 DAY: Wednesday CLIENT: Fircon Venture LTD CONTRACTOR: Site Concrete c/o Tipton Engineering CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) SAMPLE AGED POUNDS PSI Condor Dr: 11 A @ Station 8+00 3.25" 09-07-94 7 82,500 2918 11 B @ Station 8+00 3.25" 09-07-94 7 83,000 2935 12 A @ Station 5+50 2.25" 09-07-94 7 81,000 2865 12 B @ Station 5+50 2.25" 09-07-94 7 82,500 2918 13 A @ Station 3+00 3.0" 09-07-94 7 84,000 2971 13 B @ Station 3+00 3.0" 09-07-94 7 83,500 2953 Red Wing Dr: 14 A @ Station 2+00 3.25" 09-07-94 7 84,500 2989 14 B @ Station 2+00 3.25" 09-07-94 7 83,000 2935 15 A @ Station 4+50 3.5" 09-07-94 7 81,500 2882 15 B @ Station 4+50 3.5" 09-07-94 7 82,000 2900 16 A @ Station 7+00 2.75" 09-07-94 7 83,000 2935 16 B @ Station 7+00 2.75" 09-07-94 7 83,000 2935 17 A @ Station 9+50 3.0" 09-07-94 7 set destroyed 17 B @ Station 9+50 3.0" 09-07-94 7 on site Willet Dr: 18 A @ Station 2+50 2.5" 09-07-94 7 82,500 2918 18 B @ Station 2+50 2.5" 09-07-94 7 82,000 2900 SPECIFICATIONS: 3000 psi @ 28 days SUPPLIER: Patrick Corbett Technician