Loading...
Northlake WE P10B-LR 940913 (2) GlO .... CON--TING ENGINEERS IN: T~Q~e ,viro~ntal Assessments Z~, Soils & Foundations Construction Hateriats Testing "Exce[tence by Experience" Commercia[ & Industrial Inspection PO Box 92548 · Southtake, Texas 76092 · (817) 329-0281 CONCRETE CYLINDER TEST RESULTS PROJECT: Northlake Woodlands #10, Phase B LOCATION: Coppell JOB #: 94-1104 DATE OF BREAK: 09-13-94 DAY: Tuesday CLIENT: Fircon Venture LTD CONTRACTOR: Site Concrete c/o Tipton Engineering CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) SAMPLE AGED POUNDS PSI Falcon Ct: 6 A @ Station 1+00 3.0" 09-06-94 7 82,000 2900 6 B @ Station 1+00 3.0" 09-06-94 7 83,500 2953 Falcon Dr: 7 A @ Station 9+00 2.75" 09-06-94 7 81,000 2865 7 B @ Station 9+00 2.75" 09-06-94 7 81,500 2882 8 A @ Station 11+50 3.25" 09-06-94 7 80,000 2829 8 B @ Station 11+50 3.25" 09-06-94 7 81,500 2882 Condor Dr: 9 A @ Station 12+00 2.5" 09-06-94 7 84,000 2971 9 B @ Station 12+00 2.5" 09-06-94 7 82,500 2918 10 A @ Station 9+50 3.0" 09-06-94 7 86,000 3042 10 B @ Station 9+50 3.0" 09-06-94 7 85,000 3006 SPECIFICATIONS: 3000 psi @ 28 days SUPPLIER: Patrick Corbett Technician