Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Northlake WE P10B-LR 940824 (2)
COF'""LTING ENGINEERS IN: T~~e .nvironmenta[ Assessments ~I~, SoiLs & Foundations Construction #ateria[s Testing byExperience" Commercial & Industrial Inspection PO Box 92548 * SouthLake, Texas 76092 · (817) 329-0281 LINED SUBGRADE GRADATION REPORT PROJECT: Northlake Woodlands #10, Phase B LOCATION: Coppell #: 94-1104 DATE: 08-24-94 DAY: Wednesday CLIENT: Fircon Venture LTD CONTRACTOR: Site Concrete c/o Tipton Engineering % PASSING % PASSING LOCATION 1 1/2" SIEVE #4 SIEVE Condor Dr: 1 @ Station 2+00 100.0% 86.4% 2 @ Station 5+00 100.0% 81.3% 3 @ Station 8+00 100.0% 87.7% 4 @ Station 11+00 100.0% 74.1% 5 @ Station 14+00 100.0% 77.3% Falcon Ln: 6 @ Station 8+00 100.0% 78.6% 7 @ Station 11+00 100.0% 77.8% Falcon Ct: 8 @ Station 1+00 100.0% 68.7% 9 @ Station 3+00 100.0% 67.1% Alley A: 10 @ Station 2+00 100.0% 80.9% 11 @ Station 5+00 100.0% 68.6% 12 @ Station 8+00 100.0% 71.4% 13 @ Station 11+00 100.0% 77.8% 14 @ Station 14+00 100.0% 76.6% Alley B: 15 @ Station 1+00 100.O% 66.7% 16 @ Station 4+00 100.0% 70.4% 17 @ Station 7+00 100.0% 83.8% Alley C: 18 @ Station 2+00 100.0% 87.1% 19 @ Station 5+00 100.0% 82.3% 20 @ Station 8+00 100.0% 78.4% 21 @ Station 11+00 100.0% 71.6% (Continued on next page) PAGE 2 JOB #: 94-1104 DATE: 08-24-94 % PASSING % PASSING LOCATION i 1/2" SIEVE #4 SIEVE Alley D: 22 @ Station 0+50 100.0% 73.8% 23 @ Station 1+00 100.0% 86.5% 24 @ Station 4+00 100.0% 88.5% 25 @ Station 7+00 100.0% 81.4% Alley E: 26 @ Station 2+50 100.0% 74.6% Alley F: 27 @ Station 1+00 100.0% 80.6% Alley G: 28 @ Station 0+25 100.0% 89.4% Alley H: 29 @ Station 0+50 100.0% 75.9% SPECIFICATIONS: 100.0% Passing 1-1/2" Sieve 60.0% Passing #4 Sieve REMARKS: Patrick Corbett Technician