Loading...
Princeton P1-CS 971205 (2)The City With A Beautiful Future P.O. Box 478 ~1, Texas 75019 214-462-0022 Tom Wouters Renlty C~pbl Corporation 2423 E. Southhke Blvd., Suite IS0 Southbke, TX 76092 RE: Princeton Park Addition, Lot 1, Block 1 (Plmse 1) Devdopateat Fee Assesaneat Dear Mr Wouters: Enclosed is a copy of the City of Coppell Development Fee Assessment table, alons with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $4,500.00 and forward to the Finance Deparunent alon~ with a copy of the Fee Assessnwnt table. This"amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineeri~ Department will help us to verify the payment of required fees and insure a successful begjpnin~ of this project. We look forward to worldng with you on this project. If you have any questions, please contact me. Sincerely, ~., Dircaor of Engh&ri~ & Public Works Jennifer Armstrong, F'mance Director Doug Stevens, Engineeri~ Technician Public Services Gre~ Jones, Chief Building Official. C-sty Sims, Dir. Leisure Services Date: DEVELOPMENT FEE TABLE Princ,~on Park Addition, Lot 1, Block 1 (Plmse 1) 12/5/97 TOTAL AM~ DUE FEF~ DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $3,375.00 $3,375.00 (100 % due prior to Council Approval) ... Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $57.75 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation£Fireline) ,. $4,975.95 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireliue Meter Deposit $105.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $1,125.00 $1,125.00 (.100 ~ due prior to Council Approval) Wastewater Tap Inspection Fee $.50.00 (100% due at Issuance of Buildin~ Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Buildi~ Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee - $0.00 $0.00 (100% due prior to Council Approval) Street Light Fee lafommioa not (100% due prior to Acceptance of Pro~ct av~il~le at this time Street Sign Fee lafommioa aot (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submitm of TOTAL $9,968.70 TOTAL AMOUNT DUE PRIOR TO COUNCIL APi~OVAL See Roadway Impact Fee Calculation Sheet PROJECT: DATE: ('~ WORKSHEET D'EVELOPMENT FEE Princeton Park Addition, Lot 1, Block 1 (Plmst 1) 12/5/97 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): I - I inch I - I inch 2 - 8 inch 2.5 2.5 2.5 Fireline Meter(s): Total #: 7.5 ESU's @ *450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: I Domestic Meter(s) @ *57.75 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: I Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) ~ Total #: 2 Fireline Meter(s) 0 (100% due prior to issuance of water meters) *57.75 ,2.459.10 Water Meter Deposit Fee (Domestic): Total #: I Meter(s) @ *30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $35.00 ea. (i00% due prior to issuance of water meters) ESU's ESU's ESU'a ESU's ,3.376.00 '200.00 *57.75 *57.75 ,OiO0 ,4.918.20 ,30.00 ~ 105.oo Wastewater Impact Fee: Total Domestic Meters ESU' 2.5 @ *450.OOea. Wastewater Tap Inspection Fee: Total #: I Connections ~ ,50.00 ea. (100% due prior to issuance of building permit) Utility Find Inspection Fee (Ail devdopmenU): Total #: I Lots @ *50.00 ea. (100% due prior to issuance of building permit) ,1,125.00 *50.00 ,50.00 Page I WORKSHEET Park Fee (For Resdentiai Devdopments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family ~ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family ~ $350.00 / Unit {50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway l~mpact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) lnfurmation not available at this Construction Inspection Fees: A copy of the development contract must be submitted for a88essment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) * See Roadway Impact Fee Calculation Sheet Need subalim] of Page 2 ROADWAY IMPACT FEE CALCULATIONS PR~: DATE.. Prisceton Park Additios, Lot 1, Blodr, 1 (Plu~ 1) 12/5/97 ROADWAY IMPACT ** Use ** Units ** per Development Unit ** Impact Fee due = (Development Units) x 2 $3O0 Mile)= $14,184.45 * (Figure 2 - Roadway l?act Fee Study) ** (Table 3 - P. oad~ lmpm Fee Study) *** (Schedule 2, Page ~3 - Roadway Impact Fee Study) As per the 1980 Univest agreement this property can not be asse~:l for Denton Tap Rd. & Sandy Lake Rd. Therefore no Roadway Impact F~e will be collated for thi~