Loading...
Riverchase (4)-CS 940630DRC June 30, 1994 Page 4 4. The sidewalk should be a minimum of 5' in width. Rivercb~ E~_~tes Addition, Replat of Lots 5 & 6, Block C, located north of Beltline Road, east of MacArthur Blvd., off of Riverchase Drive, at the request of American Surveying Company of Dallas, Inc. No Comments. Riverch~e E~a~es No. II Addition, Preliminary_ Plat, located along the south side of Riverchase Drive, approximately 645 feet east of MacArthur Blvd., at the request of Tipton Engineering, Inc. A Traffic Impact Study should be provided showing the impact of this development on MacArthur and Beltline. Also, Fairway Drive should be constructed from Riverchase to Beltline Road at this time prior to any development in this phase. 2. The adjacent use immediately west of this site should be shown. 3. All common areas should be labeled as such. The landscape easement immediately north of Lots 1-4, Block B also doubles as a 15' alley. Therefore, the alley should be relocated so that it is adjacent to the 15' landscape easement not on top of it. Generally located on Block E of Phase II is a low area that stands in water. The U.S. Army Corp of Engineers should be contacted to determine if this will be classified as a wetlands. It is approximately 1 acre in size. The original zoning approval for Riverchase requires irrigation and landscaping on the south side of the railroad and the north side of Beltline. Plans that show those improvements should be provided. 7. Has there been any consideration given to the impact of the railroad on this development when additional freight traffic is rerouted to the DART Railroad? 8. The utilities should be placed behind the back of the proposed curb. 9. Drainage plans should be provided. 10. Sheet 1 of 2 of the preliminary utility plan should be provided. It was not included in the initial submittal. 11. Manholes will be required in lieu of the cleanouts at the end of the sewer lines. 12. Please verify that Lone Star Gas will allow you to construct a screening wall across their 20' easement. DRC June 30, 1994 Page 5 13. All information concerning this site will be required to be submitted to the City on computer diskette compatible with the City's computer system. Please contact Doug Stevens, at 393-1016 to obtain additional information. Se Village at Cottonwood Creek, Section V, Preliminary Plat, located at the northeast corner of Coppell and Thweatt Roads, at the request of Tipton Engineering, Inc. 1. You should relocate your entrance from this site to Thweatt Road to be centered between Winding Hollow Lane and Coppell Road. 2. The correct zoning both adjacent to and on this site should be shown. 3. Oak Bend Subdivision should be shown and labeled. 4. Escrow will be required for Coppell Road and Thweatt Road. 5. You should investigate if there is an existing TU easement and/or Brazos Electric Power Company easement adjacent to this site. If so, it should be shown. Will Lone Star Gas allow you to plat the lots across their easement and/or fence across their easement and/or construct driveways across their easement? You should contact them concerning the usage of the easement. It quite possibly could affect the usability of Lots 16-22, Block A. 7. A tree survey should be provided. 8. Utility plans should be provided. You should provide an alley that turns back to your proposed street between Lots 1 and 2, Block A. In conjunction with that, you should explore the possibility with the Homeowners Association of Villages of Cottonwood Creek, Section III of abandoning the existing alley connection on the west side of Villages of Cottonwood Creek Section III that connects to Minyard Drive. 9. Misty Haven Drive should be labeled as Minyard Drive. 10. All screening walls should be labeled as such. They may necessitate the dedication of a wall easement adjacent to the alley sections and/or lots adjacent to Coppell Road and Thweatt Road. e Park West Commerce Center, Replat of a part of Lot 3 and all of Lot IR, Block 7, located on Airline Drive at Enterprise Drive, at the request of Albert H. Halff Associates, Inc. 1. There needs to be additional information concerning the sanitary sewer and/or water for this site. The applicant should construct the sewer line down Wrangler Drive COPPELL PUBLIC WORKS MEMORANDUM DATE: June 30, 1994 TO: Planning and Community Services FROM: Public Works Staff RE: Comments on Riverchase Estates No II 4. 5. 6. 7. Along St. Louis and Southwestern (DART), City identifies a Hike/Bike trail system. City is applying for grant to have a regional Hike/Bike Trail constructed along this rail system. Identify street. Is developer constructing Fairways Drive? Explain lot 32A. Where are utilities planned for Phase I? Who will maintain private streets and what is developer's proposal for maintenance of utilities? /dm CC.' Engineering Dept. Central File PLANS.RIVRCHS COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: June 30, 1994 Planning and Community Services Public Works Staff Comments on Lot 5 & 6 - Riverchase No comments CC: Engineering Dept. Central File PLANS.5&6RVRCH