Riverchase (4)-CS 930212DATE: TO: FROM: RE: COPPELL PUBLIC WORKS ~rry Davis, Construction Inspector~ Rey Gonzales, Street Superintendent~ Riverchase Estates - Walk Thru 2-11-93 Attached are Streets Division comments relative to 2-11-93 walk thru of Riverchase Estates. Please make sure the contractor has a copy. RG/bc STRIVER.RG COPPELL PUBLIC WORKS DATEs February 12, 1993 TO~ Larry Davis, Construction Inspector .~ Pafford Utllltles Su .rlntendent'r%qj FR~1M~ Howard L. , p ' ~ Walk-through Punchlist for Riverchase Estates - Sewer/Sanitary Sewer This morning a walk-through was conducted on the above referenced project by Utilities field personnel. The following items were found deficient on this project. 1. Lot 29 Block A m Needs pad repoured around clean out. 2. Lot 17 Block A - Fire hydrant bonnet leaking. 3. Lot 11 Block B - Fire hydrant bonnet leaking. 4. Lot I Block C - Manhole needs rain pan. 5. Lot 11 Block G - Needs pad poured around main line Valve. 6. Lot 23 Block A - Valve stem risers need reset on valve and stacks straightened. 7. Lot 27 Block A - Lot clean out needs pad repoured. 8. Lot 18 Block A - Lot clean out needs pad repoured. 9. Lot 2 Block B - Clean out lateral needs pipe recur 10. Lot 41 Block A - Pad repoured. 11. Ail lots - Paint fire hydrant valve caps red. Please ensure that each of these items is corrected prior to acceptance of this project. If you have any questions, please advise. HLP/dm RIVRCHSE.HLP Republic Property Group Riverehase gstates Development Schedule - As of February 10. 1993 Page 1 of 1 2/I0/19~0 ~ 1 Jul'92 Aug'92 Sep'92 0ct'921tov'92~c'~ Jan'93Feb'93Mar'93 ~, Plat ~ppro~al, ,~-~ ~ ~1 ~elopment & ~an ~losing ~nstrucUon S~ki~ 8/ ~te Pre.ration , ~f~ ~___ .~ ~~~ - _ .. .. ~:4~. ,,,:--:~ Pavi~ ~ndseape ~ lrriga~on ,, Screening Wall ~t grading Building Permi~ - Models Building per~i~ 2/1 I I