Riverchase (4)-CS 920812TIPTON ENGINEERING, INC.
August 12, 1992
ENGINEERING · SURVEYING · PLANNING
6330 Belt Line Road · SuiteC · Garland, Texas75043. (214)226-2967 · FAX226-1946
By: Engineering
City of Coppell
Mr. Ken Griffin
255 Parkway Blvd
Coppell, TX 75019
RE: RIVERCHASE ADDITION
COPPE~3., TX
Dear Mr. Griffin:
Herewith is a copy of the paving and excavation contract and a copy
of the utility improvements contract for your use in preparing fees
on the above referenced project.
We have calculated the amount of fill in the street right-of-way to
be 2,240 cubic yards at the unit price of $5.25 for a total of
$11,760.00.
If you need any additional information that we may furnish at this
time, please do not hesitate to contact our office.
Sincerely,
TIPTON ENGINEERING, INC.
Richard Hovas, P.E.
Vice President
RH/ce
Enclosure