Riverchase (4)-CS 920812 (2)TIPTON ENGINEERING, INC.
ENGINEERING · SURVEYING · PLANNING
6330 BeltLine Road · SuiteC · Garland, Texas 75043 · (214) 226-2967 ° FAX 226-1946
3758
August 12, 1992
Mr. Ken Griffin
CITY OF COPPELL
255 Parkway Blvd
Coppell, TX 75019
RE:
RIVERCHASE ADDITION
COPPR~.L, TX
Dear Mr. Griffin:
Herewith is a copy of paving and excavation contract and a copy of
the utility improvements contract for your use in verifying the
inspection fee for the above referenced project.
Street, Alley & Slope
Compacted Fill (Haul In)
Water Mains
Sanitary Sewer Mains
Storm Drainage
Paving
26,500 CY @ $1.25 = $ 33,125.00
2,240 CY @ $5.25 = 11,760.00
176,444.20
162,374.25
144,982.35
541,702.30
TOTAL $1,070,388.10
Page 2
Riverchase Addition
Mr. Ken Griffin
August 12, 1992
Our calculation of the inspection fee at 2% is $21,407.76.
notify us if this is acceptable.
Please
If you need any additional information we can furnish at this time,
please do not hesitate to contact our office.
Sincerely,
TIPTON ENGINEERING, INC.
Richard Hovas, P.E.
Vice President
RH/ce
Enclosure