Loading...
Riverchase (4)-CS 920903FILE COPY TIPTON ENGINEERING, INC. ENGINEERING · SURVEYING · PLANNING 6330 BeltLine Road · SuiteC · Garland, Texas 75043 · (214) 226-2967 · FAX 226-1946 3758 September 3, 1992 Mr. Ken Griffin, P.E. CITY OF COPPRTJ. 255 Parkway Blvd Coppell, TX 75019 RIVERCHASE ESTATES COPPELL, TEXAS Dear Mr. Griffin; The storm sewer designs for this addition is based on a 10 year Future Elm Fork Peak Discharge Tailwater Elevation as set forth in the letter to your office dated August 5, 1992, from Mr. Mike Daniel with Nathan D. Maier, Consulting Engineers, Inc. The systems designed with this addition were designed to carry a 100 year discharge from the subdivision using the above described tailwater elevation. It is our understanding the design criteria for permitting tailwater elevation usage is acceptable to the city if the onsite storm drainage systems are designed to carry the 100 year discharge and the inlet sags are above the 100 year water surface elevation. Our design is to comply with the above criteria. If there ate any questions, convenience. please contact our office at your sincerely, Project Manager RP/ce