Riverchase(3)-CS 880118 MEETING MINUTES Date: January 18, 1988 Place: Pyramid Construction Trailer Subject: Riverchase Pre-construction Trailer Attendance: Jean Maier, Nathan D. Maler Consulting Engineers, Inc. Tom Dixon, Nathan D. Maier Consulting Engineers, Inc. Hank DiPietro, Nathan D. Maier Consulting Engineers, Inc. Mike Daniel, Nathan D. Maier Consulting Engineers, Inc. Steve Morton, City of Coppel! Bob Doss, Maxim Engineers, Inc. Jack E. Winder, Pyramid Developers, Inc. Abb Johnson, Pyramid Developers, Inc. Bo Leonard, Pyramid Developers, Inc. Bobby Harrell, Northwest Dallas County Flood Control District Steve Morton - Needs emergency phone numbers. - Biggest concern is keeping the Sandy Lake Road crossing clean and acceptable for car traffic. The traffic signs on Sandy Lake Road at this time are acceptable. Need to keep them clean and make sure they are standing at all times. Would like to know when first safety meeting is, and would like to bring Lt. Leonard with him to it to express his concerns. Mike Daniel The cut off date for the draws is on the 20th of each month. We will have the quantity to Pyramid by the 25th. Bo Leonard - Jack will be doing spot checks for Pyramid. Ak ~he end of the Job, Pyramid will hire a third party to check quantities. Need drawings of each site blown up with only grid lines on it (Hank will supply). Bob Doss - Will be running tests every 10,000 s.f., will need grid stakes to locate his tests. Pyramid will provide these stakes. Abb Johnson - Pyramid will start off working one-ten hour shift, five days a week. Meeting Minutes January 18, 1988 Page 2 Bo Leonard - Pyramid is responsible for first foot. If any mucking needs to be done past that, we will get together to talk about it. General Discussion: Flagman - If there are any problems, let Steve Morton or Lt. Leonard know. Female fla~men seemed to work better in the past than the male ones. We have in the past had weekly construction meetings and would like to con- tinue this practice. These meetings have proven to be very worthwhile in coordination of the project. Jeff Turner needs to take care of brush piles. Jensen needs to clean up the P~C pipe they left. Pyramid will probably be allowed to work in more than one area if there ~s enough equipment on site to properly meet the processing requirements and given schedule. This will be decided after work has begun. Tom and Abb will need to work together very closely on this. Pyramid has requested that all other hauling from the pit to stop. The District has agreed to this. cc: Bobby Harrell Abb Johnson Bo Leonard Tom Dixon Steve Morton Mike Daniel