Loading...
Princeton P2-CS001030October 30, 2000 Jimmy Archie Realty Capital Corp. 1111 South Main St., Suite 200 Grapevine, Texas 76051 Final Walk-thru Dear Mr. Archie: Please be advised that a walk-through has been scheduled for Wednesday, November 1, 2000 at 9:00 a.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project. Please ensure that all facilities are clean and accessible at that time and that contractor's representatives are present to assist with the inspection. Your cooperation in this effort is greatly appreciated. If you should have any questions, please call 972-304-7090 at your earliest convenience. Sincerely, , Lanny Allison Construction Inspector CC: Mike Martin, Assistant City Engineer Debi Ingrain, Engineering Secretary Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal Eric Royal, Royal General Contractors (fax: 972-929-1929) 255 PARKWAY ~ P.O.BOX 478 1IrCOPPEI-I- TX 75019 '~'TEL 972/462 0022 1¥ FAX 972/304 3673