Riverchase(3)-CS 870119JJR/ 300P Gar/isle Plaza, Suite 200 D~;/as, Texas 75204 ;14 8719220 303 IV. Main Street Ann Arbor, Michigan 48104 313 662 4457 Planning,; Landscape Architecture/ Urban Design Report X Conference Field Inspection Telephone Conversation Project Name: Riverchase JJR# 14300-112-61 Location: Coppell, Texas Date: 19 January 1987 Participants: Jerry Sauers-Lone Star Gas, 253-5102 Doug Jones-Lone Star Gas, 253-5102 Jesse Kever-Driver Excavating Co.,Inc., 638-7131 Tom Dixon-Nathan D. Maier Engineers, 850-2449 Tom Keyser-O'Brien Landscape Contracting, 242-7558 Paul Wiese-Johnson, Johnson & Roy/inc., 871-9220 Items discussed: This conference was necessary to discuss the installation of the Lone Star Gas line along MacArthur Boulevard. The contractor will be Driver Excavating Co., Inc. 1. The line will be installed on the west side of MacArthur Blvd. 2. The line will have a minimum 36 inches cover as measured from top of curb. 3. The line will be located 11 feet from back of curb. 4. At existing trees, Contractor will bore underneath the trees. 5. P. Wiese, from JJR, will deliver prints showing existing irrigation system and plant material and prints showing future screening walls along MacArthur to the Contractor. Conference Riverchase JJR# 14300-112-61 19 January 1987 Page 2 6. The installation is to begin immediately. Lone Star Gas expects the job to take 2 months. This summarizes the items discussed at the conference. Notify JJR of any questions or comments. Respectfully Submitted JOHNSON, JOHNSON & ROY/inc. Paul J. Wiese pjw/elp cc: Participants Jay Patterson-Riverchase Joint Venture Mike Daniel-Riverchase Joint Venture Ann Landry-JJR Jo~."..son Johnso..". & Roy.'mc FOr; M 304-2' 4/82 ~.;:.- ~-a-~v LONE STAR GAS COMPANY [~ Inside C/L ~ R/W J~E"V,I.~--I Propomd [] Outside C/L Sketch of { Completed } Project !/,j]xji Region: LOCATION ~'~ '~:~'//cltyor town ~/~~ 0 Go. No.: '~ TOWN PLANT ! ER/RR NO. ~-- .~ ~ -~ (ifotherthanl~ation) . SCHOOL DIST. MAP SHEET NO.ls) {Dallas&TarranrCoun,ies) / ~ ' ~ 1f"~ i~1~ '~ ) ~) t.-,/ lc{- z / '/ ~ 1 I SUMMARY OF PIPELINE CHANGES IN DISTRIBUTION PLANTS ABANDONED RETURNED TO NEW INSTALLATION WAREHOUSE Original ER No. or Date of Installation for replacement and Size Kind Feet Size Kind Feet Size Kind Feet retirement proje~s only: /- ~ Date of this report ~- ~- ~ M.R.-Z-A-~V LONE STAR GAS COMPANY [~ Inside C/L [-'i R/W Proposed } Project [] Outside C/L Sketch of {Comple~d - city or town SCHOOL DIST. MAP SHEET NO.(s) SUMMARY OF PIPELINE CHANGES IN DISTRIBUTION PLANTS ABANDONED RETURNED TO NEW INSTALLATION WAREHOUSE Original ER No. or Date of Installation for replacement and Size Kind I Feet Size Kind Feet Size Kind Feet retirement projects only: Date of this report // _ Z//'., ,,~(¢~