Riverchase(3)-CS 870119JJR/
300P Gar/isle Plaza, Suite 200
D~;/as, Texas 75204
;14 8719220
303 IV. Main Street
Ann Arbor, Michigan 48104
313 662 4457
Planning,;
Landscape Architecture/
Urban Design
Report
X Conference
Field Inspection
Telephone Conversation
Project Name: Riverchase
JJR# 14300-112-61
Location: Coppell, Texas
Date: 19 January 1987
Participants: Jerry Sauers-Lone Star Gas, 253-5102
Doug Jones-Lone Star Gas, 253-5102
Jesse Kever-Driver Excavating Co.,Inc., 638-7131
Tom Dixon-Nathan D. Maier Engineers, 850-2449
Tom Keyser-O'Brien Landscape Contracting, 242-7558
Paul Wiese-Johnson, Johnson & Roy/inc., 871-9220
Items discussed: This conference was necessary to discuss the
installation of the Lone Star Gas line along MacArthur
Boulevard. The contractor will be Driver Excavating
Co., Inc.
1. The line will be installed on the west side of
MacArthur Blvd.
2. The line will have a minimum 36 inches cover as
measured from top of curb.
3. The line will be located 11 feet from back of
curb.
4. At existing trees, Contractor will bore
underneath the trees.
5. P. Wiese, from JJR, will deliver prints showing
existing irrigation system and plant material and
prints showing future screening walls along
MacArthur to the Contractor.
Conference
Riverchase
JJR# 14300-112-61
19 January 1987
Page 2
6. The installation is to begin immediately. Lone
Star Gas expects the job to take 2 months.
This summarizes the items discussed at the
conference. Notify JJR of any questions or comments.
Respectfully Submitted
JOHNSON, JOHNSON & ROY/inc.
Paul J. Wiese
pjw/elp
cc: Participants
Jay Patterson-Riverchase Joint Venture
Mike Daniel-Riverchase Joint Venture
Ann Landry-JJR
Jo~."..son Johnso..". & Roy.'mc
FOr; M 304-2' 4/82
~.;:.- ~-a-~v LONE STAR GAS COMPANY
[~ Inside C/L ~ R/W J~E"V,I.~--I
Propomd
[] Outside C/L Sketch of { Completed } Project
!/,j]xji Region:
LOCATION ~'~ '~:~'//cltyor town ~/~~ 0 Go. No.: '~
TOWN PLANT ! ER/RR NO. ~-- .~ ~ -~
(ifotherthanl~ation) .
SCHOOL DIST. MAP SHEET NO.ls)
{Dallas&TarranrCoun,ies)
/ ~ ' ~ 1f"~ i~1~
'~ ) ~) t.-,/ lc{- z / '/ ~
1
I
SUMMARY OF PIPELINE CHANGES IN
DISTRIBUTION PLANTS
ABANDONED RETURNED TO NEW INSTALLATION
WAREHOUSE Original ER No. or Date of Installation for replacement and
Size Kind Feet Size Kind Feet Size Kind Feet retirement proje~s only:
/- ~ Date of this report ~- ~- ~
M.R.-Z-A-~V LONE STAR GAS COMPANY
[~ Inside C/L [-'i R/W
Proposed } Project
[] Outside C/L Sketch of {Comple~d -
city or town
SCHOOL DIST. MAP SHEET NO.(s)
SUMMARY OF PIPELINE CHANGES IN
DISTRIBUTION PLANTS
ABANDONED RETURNED TO NEW INSTALLATION
WAREHOUSE Original ER No. or Date of Installation for replacement and
Size Kind I Feet Size Kind Feet Size Kind Feet retirement projects only:
Date of this report // _ Z//'., ,,~(¢~