Loading...
Riverchase(2)-CS 890918DATE: Se~ ..ptember .... 18, !989 Inspec. TI]; Larry Davis, Const. ruc:tion ...... FROM: Per Birdsall, Street Super:intendent~ RE-' Ri ver'clnase Gol 5 C1 ub- Bond Walk "thru ]"he one year' maintenance bond is up ~:or this project on 1A/20/89. The ¥ol.lowing are punch list items noted at this time. 1. 2 cracks in the curb and gutter on the norti3 side- rout and seal 2. 2 c:racks around the valve stack running into the curb and ~utter on the north side---rout and seal 3. Ha:~rl:~ne c:r-ack on the south side -From the street to the pavers- rout and seal 4. Ha:i. rline ct'ack on the south s:i. de in the curb and gutter .... rout and seal 5. Pavers c~n the east side of trail sinking in (2:' x 3:') to ~10 tee I~ you have any questions, please let me know. F'HB/bb cc:'.' Steve Goram, Director of Public: Works RCHASE. PHB