Loading...
Riverchase(2)-CS 880714 .. O. Box 478 Coppell, Texas 75019  The City With A Beautiful Future 214-462-0022 UTILITY LINE INSPECTION AND TESTING Date: -7/ /9/ Area: Line: Diameter: Length: Plan Sheet No: PRESSURE TEST START FINISH Time: ~ ,' O(_~ ~ Time: Pressure: rS-CD Pressure: ~ ~ c~ A__llowable Leakage Per Da},: (Il.&5 gpd) X ( miles of .pipe) X ( inch Diameter) Gallons Lost Per Day: ( Gal. Lost) ~ (__Hrs. Tested) X 24 Hrs. Passed: / Rejected: INFILTKATION/EXFILTKATION TEST START FINISH Time: Time: Allowable Leakage Per Day: (250 gpd) X ( miles of pipe).X (__inch Diameter) Gallons Lo£~ Per Day: ( Gal. Lost) ~ ( Hrs. Tested) X 24 }irs. = Passed: Rejected CO~ENTS: Te~!ed Performed By: r Rejected By: