Loading...
Riverchase(2)-CS 880405 COPPELL PUBLIC WORKS MEMORANDUM April. 5, 1988 TO: Planning & Zoning FRO:~I: Public Works A~ministration ,~4~ I.'.E: Riverchase Clubhot~e Addition - Meter Vault Tar'¥o,~0 after careful review and consideration I feel it necessary to install the ~.~ter and check valve vaults for the following reasons: !) Vaults are re_quired to separate privately maintained water lines from city nv_~intained water lines. This has been enforced since 1985 on all multi- f~mmily, con~nercial, and industrial developments. 2) 'i%e proposed 2" meter would require a meter reader to travel 435' onto private p~ope, rty to read. 2) 60% of water line will be under cone parking lot. 4) '"he 8" line was extended to provide temporary water for golf course only. F..n. gineer and utility contractor ~re both made aware that to utilize line I'or- water service in future it would require the vault or possibly realignment ,;? line. .Sit,ce there was no site plan at that time. ~% ,'losing I don't feel it is fair to deviate from our normal re_quirements. ~] f,~<~.], we would ,be doing a disservice to past developments which were required I_r) ,"onfo]..-m to this rec~]irement. SMM/bb cc: Steve Goram, Director of Public Works