ST9905-CS010816 (2) Page 1 1
MEETING MINUTES
AUGUST 16, 2001
BETHEL ROAD (DALLAS/TARRANT COUNTY LINE TO FREEPORT ROAD)
Attendees:
Ken Griffin. P.E. City of Coppell - Director of Engineering
Teresa Tumer City of Coppell - Graduate Engineer
Susan Taylor City of Coppell - CIP Coordinator
Paul Padilla, P.E. Transystems - Project Coordinator
Joe Masterson, P.E. TranSystems - Project Manager
Craig Bond, P.E. TranSystems - Project Engineer
Mike Hobbs TranSystems - Project Hydrologist
Details of Meeting:
Design Criteria
·Ken met with Gerry/City of Grapevine who indicated that Bethel would be 6-lane from 121
to the Coppell. Ken to follow up with Jerry. TranSystems to proceed with design for 4-lane.
· Le~ turn lanes required at medians
· Median widths to be 16 ft
· Sandy Lake Road used 27 ft back-to-back, including the bike lane
·Our typical section will be: 27 ft back to back/16 ft median/27 ft back-to-back, for an over
all width of 70 ft.
· Plan for 5 ft sidewalks to be 1 ft from property line, or 2 ft from back of curb.
· Face of retaining walls no closer than 7 ft from back of curb
· Use 90ft for median openings ----
· Split pavement elevations are OK if necessary, do not exceed 1 ~t difference
· Do not include City Detail Sheets in drawings unless different that standard details
~ Utilities
· Ken has list of permits issued for utility installation (phone, fiber optic and cable), he will
supply this list to TranSystems
· Most of the City agreements will require utilities to move their lines/structures in the event of
road widening, except for Explorer Pipeline
· City agreements may not apply to gas or overhead power transmission lines
·Added several entities (bolded below) to list of existing utility companies that TranSystems
will be contacting to verify existing line locations
- GTE
- MSN/CSD (Metromedia)
- AT&T Local Services
- SWBT
- Touch America (fiber optic)
- UG Television Cable
Page 1 of 3
!Ken Griffin-
General Telephone Company
Explorer Pipeline
Southwest Inc. (cable)
Gas
- Overhead Electric
- Quest (going into Touch One's condui0
- AT & T Broadband
- City of Grapevine
Right-of-Way Requirements
· There was considerable discussion related to the ROW requirements adjacent to the CICI's
Addition and the Gulf United Industries' Addition property. TranSystems will adjust the
roadway alignment to minimize the impacts to these properties. Of particular concern was
the newly established landscaping.
· East of Freeport Pkwy, acquire the entire 90 ft of ROW adjacent to the Duke-Freeport
Addition property.
Easements
· City uses permanent easements for drainage or ROW, "Letters of Permission" for changing
contour (cut or fill), and "Slope Easements" when sloped area is not functional for other uses
(City pays approx. 25% of property value for these situations)
· Ken talked about using slope easements between Sta. 19+00 and 21+50 (in front of CICI's
building)
Drives w/Multi-Box Culverts In Front of Post Office Processing Center
· Talked about options for adding perpendicular wing walls (out to the top of the concrete lined
channel) at the three drives w/multi-box culverts. Options included:
1. flush retaining wall with TXDOT-PRI handrails (painted gray or maybe galvanized
aluminum)- O..o~or TM "~ ~q~l,~l~,gt/k.aff ~~1 .C~
2. skip handrails and use short concrete walls to match existing architectttfe. No final
decision, TranSystems will investigate options. Ken emphasized the need for an aesthetic
solution.
Transitions From Existing 2-Lane to 4-Lane
· At Grapevine/Coppel Line (Dallas/Tarrant County Line) all of the transition to be in Coppell
· At Freeport Road, transition to begin at Freeport and go approx. 400 ft to the east
Tm Lanes
· Show Turn Lanes at Royal Lane
· Show Turn Lanes at Freeport Road
Hydraulic Study
· TranSystems has completed the study of existing conditions and has obtained effective
models from the US Army Corps of Engineers and FEMA.
· TranSystems requested design information for the ponds serving the new development north
Page 2 of 3
~ ........... page.,3~t
of Bethel Road. Ken will contact the design firms for these developments and obtain the
information.
x=~ TranSystems will prepare a Stormwater Routing Study to incorporate the existing ponds.
This study will be used to size a detention pond on airport property. Upon completion of the
Routing Study, TranSystems will schedule a meeting with the airport.
· On the west-end of the project, the enclosed storm sewer will be extended to Cottonwood
Creek in Grapevine. ~~.
Status Report
· TranSystems will prepare and submit a Project Status Report to Ken, Teresa and Susan every
two weeks.
t
Page 3 of 3
i~Ken Griffin, 8,16_01.Meeti_ng Mi~nut~s on Bethel ROad
From: DL-Charles Bond <ccbond@transystems.com>
To: '"kgriffin@ci.coppell.tx. us'" <kgriffin@ci.coppell...
Date: Fri, Aug 17, 2001 4:45 PM
Subject: 8-16-01 Meeting Minutes on Bethel Road
Ken,
Attached are the minutes from our 8-16-01 meeting on Bethel Road. If you
have any additional comments, please let me know. Thanks.
Craig
<<MtgMinutes8-16-01.doc>>