ST9301-CS 990908 TXU
TXU Electric
1506 Commerce Street
Dallas, TX 75201
September 8, 1999
Mr. Ken Griffin, P.E.
Director of Engineering and Public Works
City of Coppell
255 Parkway Blvd.
P. O. Box 478
Coppell, Texas 75019
RE: Difference in Cost for Circuit Crossing on Sandy Lake Rd. east of MacArthur
Per our recent conversation, I have prepared an estimate for the difference in cost for the circuit crossing on
Sandy Lake Road east of MacArthur. The difference between overhead construction and underground
construction is $15,484.00. This price does not include a spare 6" pvc sleeve, as TXU Electric & Gas will
cover that cost. Relocation of the TXU Electric & Gas facilities for the Sandy Lake Road expansion are
being coordinated with a project to add system capacity to the Coppell area and will start late this fall. If
you have any questions please give me a call at ( 214 ) 812-7310. Thanks.
Sincerely,
Bobby Inmon
Engineering Analyst
East Design Engineering Dept.
TXU Electric & Gas