Loading...
Riverchase(5)-CS 890124 Central Regional Wsstewster System January 24, 1989 Mr. Steve Morton Chief, Public Works Inspection City of Coppell P.O. Box 4?8 Coppell, Texas 75019 Subject: Central Regional Wastewater System Coppell Interceptor Riverchase Development Dear Mr. Morton: On June 2, 1987, personnel from the Trinity River Authority's Engineering Division conducted a final inspection of the point of entry for the above mentioned project. The connection is now completed to Authority standards and the Authority approves the point of entry. Due to the likelihood of a back-up into the City's line from the Authority's Coppell interceptor, the Authority recommends periodic flushing of the City's line to alleviate the solids build-up until such time the developments flow contribution becomes significant. Again, it is understood that the point of entry flow will represent the City of Coppell and will be metered at meter station I?.0E. If you have any questions, please call me. Sincerely, RKPATRICK eertng Technician P.O. Box 531196 Grand Prairie, Texas 75053 (214) Metro 263-2251