Loading...
Riverchase(5)-CS 870421 NORTHERN REGION PROJECTS REQUEST FOR A POINT OF ENTRY CONTRACTING PARTY: City nf On[~[~l 1 PROPOSED PROJECT NAME.~ Riverchase DESIGN ENGINEER: Nathan D. Maier Consulting Engineers, Inc. CONTACT: Janet Vick TELEPHON£ NO. 739-4741 LOCATION OF PROPOSED CONNECTION (TRA NOMENCLATURE). NOTE: DETAILS CONCERNING IRA INTERCEPTORS ARE AVAILABLE FROM THE PROJECT BUT SHOULD BE VERIFIED IN THE FIELD PRIOR TO SUBMITTAL.' PROJECT CRWS x TMC INTERCEPTOR: Coppell Interceptor STATION NO.: 130 + 98 PLANNED LAND USE FOR THE AREA TO BE SERVED: 93% Residential 7~ Commercial -ACREAGE:. 221~ Acres INITIAL FLOW EXPECTED: 0 MGD (DAILY AVERAGE) 0 MGD (PEAK) ULTIMATE FLOW EXPECTED: 1.3 MGD (DAILY AVERAGE) 3.38 MGD (PEAK) BASIS FOR ESYABLISHING FLOWS: Based on 3.6 people/unit as per zoning density., for average daily flow. Peak flow equals 2.5 times average daily flow plus infiltration. Infiltration of 500 GPD/Acre. TYPE OF CONNECTION: . EXISTING MANHOLE: CONSTRUCT MANHOLE~ x SIZE OF. CONNECTION: 15 SLOPE AT CONNECTION~ 0.i'5% 'MATERIAL OF CONNECTION: PVC METERING FACILITY PROPOSED? YES x NO TYPE ~TACHMENTS ACCOMPANYING THIS REQUEST CONTAIN: (PLEASE CHECK) CONNECTION: METERING ~CILITY: PLAN SHEETS x PLAN SHEETS PROFILE SHEETS x PROFILE SHEETS SPECIFICATIONS CONSTRUCTION PRINTS CONSTRUCTION SPECIFIC~IOHS' EQUIPMENT SPECIFIC~IONS GENE~L: SERVICE AREA ~P × (INCLUDES D~INAGE AREA, CITY ~ BOUN~RIES, AND NAME OF DEVELOPMENT) REQUEST SUBMI~ED BY: /~// Y~t SIG~TURE: CONTRACTING PARTY: ~Cit Coppell TRA USE ONLY POE NO. THE ABOVE POINT OF ENTRY IS HEREBY ,~ SUBJECT TO THE FOLLOWING CONDITIONS: SIGNED: ~ DATE: APPROVED BY: DATE: CC: NORTHERN REGION OFFICE ZONING CRITERIA MF-2 = 24 units/AC MF-1 = 18 units/AC , SF-0 = 1 unit/4000 Sq. Ft. R = 0.1 Gal./Sq. Ft. Floor Space (50% AC) .. 0 = 0.2 Gal./Sq. Ft. Floor Space (50% AC) Based on 3.6 persons/unit ND~ '" "' '"' ¢ONIULTIHG BNGINEEII, INC, D&II&I, Texie 1;1} 111,'1'11%11; September 29, 1988 Mr. Steve Goram City of Coppell P.O. Box 478 Coppe~l'~ TX 75019 Re: 15" Sanitary Sewer Line - Riverchase Dear Steve: We have reviewed the above subject plans for your concern regarding the backing up of sewage in the subject sewer line. Our review took into consideration your statement that the sewage is backed up approximately 320' from the point of entry to the TRA interceptor. After review of the as-built plans showing the angle of entry where the 15" SS ties into the TRA system, we recommend that further engineering be pursued to improve this present condition prior to final acceptance of the facility. It would be appropriate in this situation to have Terra and their consulting engineers re-evaluate the situation and propose an acceptable solution to you that will alleviate this present backing up situation. On a gravity sewer line, the city should look for a design that allows for the discharge of sewage to not be restricted by any opposing velocity head. We hope this accommodates your concerns. Sincerely, Kevin Pei f{e~' KP/dsp cc: Russell Doyle H. Wayne Ginn File 305L-