Riverchase (6.4)-CS 960408April 8, 1996
QI.0. Box 478
oppell, Texas 75019
4-462-0022
Fehmi Karahan
Riverchase Plaza Limited
5501 LBJ Freeway
Suite 905
Dallas, Texas 75240
RE: Riverchase Phase H lot B-R
Development Fee Assessment
Dear Mr. Karahan:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of
the Development Fee Calculations for the Rivereh_a~e Phase II Lot mR Addition.
Please make payment to the City of Coppell in the amount of $9.450.00 and forward it to Jennifer
Armstrong, Finance Director, along with a copy of the Fee Assessment List. A copy of the
Engineer's estimate or contract for this project will need to be provided to our department so the
construction inspection fee can be verified.
Providing a copy of your paid receipt to our office will help us to verify payment of the required
fees and insure a successful beginning of this project. We look forward to working with you on this
project. If you have any questions, please do not hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Assistant City Manager/City Engineer
CC:
Jennifer Armstrong, Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
Ted Dutt, Interim Utilities Superintendent
Barbara Coleman, Street Division
Rick Wieland, Parks Development Coordinator
CITY OF COPPELL
DEVELO~NT FEES
Date:
Project:
April 8, 1996
Riverchase Phase H lot B-R
TOTAL AMOUNT DUE
~ PRIOR TO
COUNCIL
Water Impact Fee 5,850.00 5,850.00
(100% due prior to Council Approval)
Water Tap Inspection Fee 100.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee 3,600.00 3,600.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee 50.00
(100% due at Issuance of Building Permit)
Water Meter Fee (Domestic) 195.98
(100% due at Issuance of Water Meter)
Water Meter Deposit (Non-Residential) 30.00
(100% due at Issuance of Water Meter
Water Meter Fee (Irrigation & Fire) 134.93
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit 35.00
(100% due at Issuance of Water Meters)
Street Sign Fee
(100% due prior to Acceptance of Project)
Street Light Fee * information not
(100% due prior to Acceptance of Project) available
Park Fee
(50% due prior to Council Approval)
(50% due prior to Issuance of Building Permit)
Street Escrow 0
(100% due prior to Council Approval)
Construction Inspection Fee need submittal of
(2% of Project Cost due prior to Preconstr. Mtg.) contracts
TOTAL $ 9,860.98 $9,450.00
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL
* This fee cannot be asse,s,sed until after TU Elec~c submits the lighting plan for the pwposed project. Once tho plan
is submitted, $292.60 per light will be ~.
COPP~nn ENGINEERING
DATE:
TO:
FROM:
RE:
March 2, 1996
Mike Martin, Assistant city Engineer
Ted Dutt, Interim Utilities Superintendent
Development Fees for RIVERCW~_aSE pWA~E II LOT B-R
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
1 - ~" Domestic Meter/s ~ 8 ESU's
1 - 1% Irrigation Meter/s = 5 ESU's
- Fireline Meter/s = ESU's
Total 13 ESU's ~ $450.00 ea = ~
100% due prior to Council approval of the final plat.
WastewaterImpact
1 - 2" Domestic Meter/s = 8
Total 8 ESU's ~ $450.00 ea =
ESU ' S
$3 , 600 · O0
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
2 Connections ~ $50.00 each = $100.00
lOO% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
Connections @ $50.00 each
100% due prior to issuance of building permit.
(RE-INSPECTIONS for Water or Wastewater
(Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (Ail Development)
I lots ~ $ 50.O0/lot = $50.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
1 - 2" Domestic Meters ~ $195.98 = $195.98
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Met~Fee
- 1%
(Irrigation/Fireline)
Irrigation Meter/s ~ $134.93 ea = $154.93
Fireline Meter/s ~ $ ea = $
Total $134.93
100% due prior to issuance of water meter/s.
Water Meter Deposit (Hulti-Family or Non-Residential)
1 Meters ~ $30.00 ea = $30.00
100% due prior to issuance of water meters.
Irrigation HeterDeposit
1 Meters ~ $35.00 ea = $35.00
100% due prior to issuance of water meters.
ESCROW ~ .~OADWAY IMPACT FEE CAL~_, ULATIONS
PROJECT:
DATE:
Riverchase Plaza Phase II
4/9/96
STREET ESCROW:
Street Name(s) [
Street Type [[
Cost per Foot ' I
Length of Adjacent Frontal~e (Linear Feet) ]
MacArthur Blvd.
Escrow due = (Cost per Foot) x (Lensth of Adjacent Frontage) =
381.19
$0.00]
ROADWAY IMPACT FEE:
Service Area * 7
Category ** Commercial
Land Use **
Buildin~ Size (Sq. Ft.)
Development Units **
Shoppin$ Center
14,237
14.237
Vehicle Miles per Development Unit ** 4.77
Fee per Vehicle Mile $300
Roadway Impact Fee due = (Development Units) x
Vehicle Miles per Development Uni0 x (Fee [mr Vehicle Mile) =
$20,373.15
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
Amount due is the lesser of the Street Escrow or the Roadway Impact Fee.