Riverchase (6.4)-CS 960302DATE:
TO:
FROM:
RE:
COPPRnn ENGINEERING
WE~ORANDUN
March 2, 1996
Mike Martin, Assistant city Engineer
Ted Dutt, Interim Utilities Superintendent
Development Fees for PjVERC~aSE PHASE II LOTB-R
The following fees
referenced project.
Water Impa~t Fee:
should be assessed and collected on the above
Total
2" Domestic Meter/s = ~ ESU's
1 ~ Irrigation Meter/s = $ ESU's
Fireline Meter/s = ESU's
~3 ESU's @ $450.00 ea = $5,850.00
100% due prior to Council approval of the final plat.
WastewaterImpect
1 - ~" Domestic Meter/s = 8
Total 8 ESU's @ $450.00 ea =
ESU ' S
$$.6oo.oo
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
Z Connections ~ $50.00 each = S100.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
Connections @ $50.00 each = $
100% due prior to issuance of building permit. (Residential only)
(RE-INSPECTIONS for Water or Wastewater $30.00)
Development Fees
Page 2
Utility Final Inspection Fee (Ail Development)
1 lots @ $ 50.00/lot = S50.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
1 - $" Domestic Meters @ $395.98 = S195.98
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
1 - 1 ~ Irrigation Meter/s @ $154.95 ea
- Fireline Meter/s @ $
Total
100% due prior to issuance of water meter/s.
Water MeterDe~osit (Hulti-Fa~ily or Non-Remidential)
1 Meters @ $30.00 ea =
100% due prior to issuance
Irrigation Meter Depomit
1 Meters @ $35.00 ea
$$0,00
of water meters.
= $35.00
100% due prior to issuance of water meters.
= S134.93
e~ = $
S154.95