Loading...
Riverchase (6.4)-CS 960302DATE: TO: FROM: RE: COPPRnn ENGINEERING WE~ORANDUN March 2, 1996 Mike Martin, Assistant city Engineer Ted Dutt, Interim Utilities Superintendent Development Fees for PjVERC~aSE PHASE II LOTB-R The following fees referenced project. Water Impa~t Fee: should be assessed and collected on the above Total 2" Domestic Meter/s = ~ ESU's 1 ~ Irrigation Meter/s = $ ESU's Fireline Meter/s = ESU's ~3 ESU's @ $450.00 ea = $5,850.00 100% due prior to Council approval of the final plat. WastewaterImpect 1 - ~" Domestic Meter/s = 8 Total 8 ESU's @ $450.00 ea = ESU ' S $$.6oo.oo 100% due prior to Council approval of the final plat. Water Tap Inspection Fee Z Connections ~ $50.00 each = S100.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee Connections @ $50.00 each = $ 100% due prior to issuance of building permit. (Residential only) (RE-INSPECTIONS for Water or Wastewater $30.00) Development Fees Page 2 Utility Final Inspection Fee (Ail Development) 1 lots @ $ 50.00/lot = S50.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 1 - $" Domestic Meters @ $395.98 = S195.98 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 1 - 1 ~ Irrigation Meter/s @ $154.95 ea - Fireline Meter/s @ $ Total 100% due prior to issuance of water meter/s. Water MeterDe~osit (Hulti-Fa~ily or Non-Remidential) 1 Meters @ $30.00 ea = 100% due prior to issuance Irrigation Meter Depomit 1 Meters @ $35.00 ea $$0,00 of water meters. = $35.00 100% due prior to issuance of water meters. = S134.93 e~ = $ S154.95